Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2016 |
Principal Product | Chemicals for personal care industry |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2869 - Industrial Organic Chemicals, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 61 |
Plant Area (Sq.Ft.) | 163,000 |
Annual Production | 7,900 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,383,404 | 17,634,750 | kWh | $0.14 |
Electricity Demand | $99,138 | 30,785 | kW-months/year | $3.22 |
Electricity Fees | $(-77) | - | $ | - |
Natural Gas | $1,397,304 | 163,046 | MMBtu | $8.57 |
TOTAL ENERGY COSTS | $3,987,346 | |||
RECOMMENDED SAVINGS* | $1,908,752 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $66,725 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3416 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST |
Savings: $1,595,248 Cost: $5,445,000 |
$2,103,177 | 15,579,089 | $342,740 | - | $(-539,087) | (-62,904) | - | - | $(-311,582) | - | - | - |
$2,103,177 15,579,089 kWh |
$342,740 - $ |
$(-539,087) (-62,904) MMBtu |
- - Tgal |
$(-311,582) - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $112,215 Cost: $1,000 |
$112,215 | 831,223 | - | - | - | - | - | - | - | - | - | - |
$112,215 831,223 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $71,309 Cost: $500,000 |
$71,309 | 528,214 | - | - | - | - | - | - | - | - | - | - |
$71,309 528,214 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $62,104 Cost: $250,000 |
- | - | - | - | $33,337 | 3,890 | $20,329 | 3,586 | - | - | $8,438 | - |
- - kWh |
- - $ |
$33,337 3,890 MMBtu |
$20,329 3,586 Tgal |
- - $ |
$8,438 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $34,769 Cost: $3,000 |
- | - | - | - | - | - | $34,769 | 6,134 | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
$34,769 6,134 Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,043 Cost: $13,895 |
$25,043 | 185,507 | - | - | - | - | - | - | - | - | - | - |
$25,043 185,507 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,913 Cost: $4,940 |
$6,913 | 51,208 | - | - | - | - | - | - | - | - | - | - |
$6,913 51,208 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4134 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE |
Savings: $1,151 Cost: $500 |
$1,151 | 8,528 | - | - | - | - | - | - | - | - | - | - |
$1,151 8,528 kWh |
- - $ |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,908,752 Cost: $6,218,335 |
$2,319,808 | 17,183,769 | $342,740 | - | $(-505,750) | (-59,014) | $55,098 | 9,720 | $(-311,582) | - | $8,438 | - | $2,319,808 17,183,769 kWh |
$342,740 - $ |
$(-505,750) (-59,014) MMBtu |
$55,098 9,720 Tgal |
$(-311,582) - $ |
$8,438 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $66,725 Cost: $21,835 |
$31,956 | 236,715 | - | - | - | - | $34,769 | 6,134 | - | - | - | - | $31,956 236,715 kWh |
- - $ |
- - MMBtu |
$34,769 6,134 Tgal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Fees | Natural Gas | Water Disposal | Administrative Changes | Water Consumption |