IAC Assessment: MA0758
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0758
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2016
Principal Product Treated drinking water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $10,000,000-$50,000,000
# of Employees 9
Plant Area (Sq.Ft.) 80,000
Annual Production 3,800,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,340 1,814,784 kWh $0.11
Electricity Demand $73,516 10,559 kW-months/year $6.96
Electricity Fees $5,712 - $ -
Natural Gas $19,237 2,061 MMBtu $9.33
TOTAL ENERGY COSTS $296,805
RECOMMENDED SAVINGS* $9,628 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,874
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$2,549
Cost:
$2,836
- - - - - - $2,549 328 -
-
kWh
-
-
kW-months/year
-
-
$
$2,549
328
MMBtu
02: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$2,464
Cost:
$500
$2,464 22,604 - - - - - - $2,464
22,604
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,272
Cost:
$1,450
$2,272 20,848 - - - - - - $2,272
20,848
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$917
Cost:
$960
$190 (-327) $727 92 - - - - $190
(-327)
kWh
$727
92
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7314 REDUCE VENTILATION AIR Savings:
$754
Cost:
$3,000
- - - - - - $754 97 -
-
kWh
-
-
kW-months/year
-
-
$
$754
97
MMBtu
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$672
Cost:
$500
- - - - $672 - - - -
-
kWh
-
-
kW-months/year
$672
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,628
Cost:
$9,246
$4,926 43,125 $727 92 $672 - $3,303 425 $4,926
43,125
kWh
$727
92
kW-months/year
$672
-
$
$3,303
425
MMBtu
TOTAL IMPLEMENTED Savings:
$8,874
Cost:
$6,246
$4,926 43,125 $727 92 $672 - $2,549 328 $4,926
43,125
kWh
$727
92
kW-months/year
$672
-
$
$2,549
328
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas