IAC logo
IAC Assessment: MA0761
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0761
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2016
Principal Product Fresh and frozen fish items
NAICS 311710 - Seafood Product Preparation and Packaging
SIC 2092 - Fresh Or Frozen Prepared Fish
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 12,000
Annual Production 7,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,947 1,458,600 kWh $0.15
Electricity Demand $22,502 5,740 kW-months/year $3.92
Electricity Fees $2,400 - $ -
Natural Gas $68,843 5,101 MMBtu $13.50
TOTAL ENERGY COSTS $307,692
RECOMMENDED SAVINGS* $41,570 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$22,997
Cost:
$134,000
$22,997 156,442 - - - - - - $22,997
156,442
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,889
Cost:
$2,685
$7,889 53,665 - - - - - - $7,889
53,665
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,969
Cost:
$6,409
$5,969 40,606 - - - - - - $5,969
40,606
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$3,035
Cost:
$4,050
$(-200) (-1,359) - - - - $3,235 598 $(-200)
(-1,359)
kWh
-
-
kW-months/year
-
-
MMBtu
$3,235
598
Tgal
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$864
Cost:
$342
- - - - $864 64 - - -
-
kWh
-
-
kW-months/year
$864
64
MMBtu
-
-
Tgal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$816
Cost:
$2,000
- - $816 208 - - - - -
-
kWh
$816
208
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$41,570
Cost:
$149,486
$36,655 249,354 $816 208 $864 64 $3,235 598 $36,655
249,354
kWh
$816
208
kW-months/year
$864
64
MMBtu
$3,235
598
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Usage Electricity Usage Electricity Demand Natural Gas Water Usage