Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Treated potable water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $5,000,000-$10,000,000
# of Employees 22
Plant Area (Sq.Ft.) 26,436
Annual Production 1,102,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,622 542,400 kWh $0.13
Electricity Demand $10,766 1,805 kW-months/year $5.96
Electricity Fees $2,676 - $ -
LPG $70,313 4,794 MMBtu $14.67
TOTAL ENERGY COSTS $155,377
RECOMMENDED SAVINGS* $150,968 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,271
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$90,005
Cost:
$373,605
$57,422 435,017 $1,575 264 - - $31,008 - $57,422
435,017
kWh
$1,575
264
kW-months/year
-
-
MMBtu
$31,008
-
$
02: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$33,419
Cost:
$150,000
$32,059 242,869 $1,360 228 - - - - $32,059
242,869
kWh
$1,360
228
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$11,675
Cost:
$375
- - - - $11,675 796 - - -
-
kWh
-
-
kW-months/year
$11,675
796
MMBtu
-
-
$
04: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$8,358
Cost:
$250
$188 1,424 - - $8,170 557 - - $188
1,424
kWh
-
-
kW-months/year
$8,170
557
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,596
Cost:
$24,389
$4,898 37,105 $698 117 - - - - $4,898
37,105
kWh
$698
117
kW-months/year
-
-
MMBtu
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,915
Cost:
$250
- - $1,915 321 - - - - -
-
kWh
$1,915
321
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$150,968
Cost:
$548,869
$94,567 716,415 $5,548 930 $19,845 1,353 $31,008 - $94,567
716,415
kWh
$5,548
930
kW-months/year
$19,845
1,353
MMBtu
$31,008
-
$
TOTAL IMPLEMENTED Savings:
$17,271
Cost:
$24,764
$4,898 37,105 $698 117 $11,675 796 - - $4,898
37,105
kWh
$698
117
kW-months/year
$11,675
796
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG One-time Revenue or Avoided Cost