IAC logo
IAC Assessment: MA0817
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0817
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Treated wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 3
Plant Area (Sq.Ft.) 14,200
Annual Production 383,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,025 529,760 kWh $0.14
Electricity Demand $13,584 1,252 kW-months/year $10.85
Fuel Oil #2 $17,181 1,108 MMBtu $15.51
TOTAL ENERGY COSTS $102,790
RECOMMENDED SAVINGS* $6,224 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,182
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$2,919
Cost:
$5,650
$(-2,027) (-14,904) $4,946 319 $(-2,027)
(-14,904)
kWh
$4,946
319
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,876
Cost:
$50
- - $1,876 121 -
-
kWh
$1,876
121
MMBtu
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,042
Cost:
$100
$1,042 7,698 - - $1,042
7,698
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$387
Cost:
$1,503
$387 2,849 - - $387
2,849
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$6,224
Cost:
$7,303
$(-598) (-4,357) $6,822 440 $(-598)
(-4,357)
kWh
$6,822
440
MMBtu
TOTAL IMPLEMENTED Savings:
$5,182
Cost:
$7,203
$(-1,640) (-12,055) $6,822 440 $(-1,640)
(-12,055)
kWh
$6,822
440
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2