IAC logo
IAC Assessment: MA0858
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0858
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Water treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 4
Plant Area (Sq.Ft.) 14,800
Annual Production 53,642 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $94,459 516,400 kWh $0.18
Electricity Demand $34,873 1,184 kW-months/year $29.45
Other Energy $9,694 299 MMBtu $32.42
TOTAL ENERGY COSTS $139,026
RECOMMENDED SAVINGS* $72,441 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$29,333
Cost:
$216,701
$21,176 115,715 - - $8,157 - $21,176
115,715
kWh
-
-
kW-months/year
$8,157
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$27,331
Cost:
$166,000
$22,376 122,276 $4,955 168 - - $22,376
122,276
kWh
$4,955
168
kW-months/year
-
-
$
03: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$12,269
Cost:
$11,300
$9,618 52,560 $2,651 90 - - $9,618
52,560
kWh
$2,651
90
kW-months/year
-
-
$
04: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$3,098
Cost:
$5,000
$2,038 11,134 $1,060 36 - - $2,038
11,134
kWh
$1,060
36
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$264
$116 633 $88 3 - - $116
633
kWh
$88
3
kW-months/year
-
-
$
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$106
Cost:
$375
$106 580 - - - - $106
580
kWh
-
-
kW-months/year
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$100
Cost:
$375
$100 547 - - - - $100
547
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$72,441
Cost:
$400,015
$55,530 303,445 $8,754 297 $8,157 - $55,530
303,445
kWh
$8,754
297
kW-months/year
$8,157
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees