IAC logo
IAC Assessment: ME0103
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0103
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1993
Principal Product Machine Components
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 56,000
Annual Production 18,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $922,694 10,025,205 kWh $0.09
LPG $81,946 7,663 MMBtu $10.69
Fuel Oil #2 $10,054 1,709 MMBtu $5.88
Other Energy $1,115 152 MMBtu $7.34
TOTAL ENERGY COSTS $1,015,809
RECOMMENDED SAVINGS* $99,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,343
#|Description Savings
Cost
Status Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,228
Cost:
$180
$1,228 12,896 - - - - $1,228
12,896
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,470
Cost:
$1,300
- - - - $1,470 250 -
-
kWh
-
-
MMBtu
$1,470
250
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$69,216
Cost:
$175,000
$69,216 410,317 - - - - $69,216
410,317
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.6224 SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS Savings:
$8,100
Cost:
$20,000
- - $8,100 1,020 - - -
-
kWh
$8,100
1,020
MMBtu
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,120
Cost:
$700
- - - - $3,120 422 -
-
kWh
-
-
MMBtu
$3,120
422
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,129
Cost:
$13,680
$14,129 153,576 - - - - $14,129
153,576
kWh
-
-
MMBtu
-
-
MMBtu
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$2,223
Cost:
-
$2,223 - - - - - $2,223
-
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,486
Cost:
$210,860
$86,796 576,789 $8,100 1,020 $4,590 672 $86,796
576,789
kWh
$8,100
1,020
MMBtu
$4,590
672
MMBtu
TOTAL IMPLEMENTED Savings:
$5,343
Cost:
$700
$2,223 - - - $3,120 422 $2,223
-
kWh
-
-
MMBtu
$3,120
422
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage LPG Fuel Oil #2 Electricity Usage LPG Fuel Oil #2