Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | Icecream |
NAICS | n/a |
SIC | 2042 - |
Sales | $5,000,000-$10,000,000 |
# of Employees | 26 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 1,000,000 Thousand Gallons |
Production Hrs. Annual | 4,000 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $295,528 | 3,040,446 | kWh | $0.10 |
Fuel Oil #6 | $20,159 | 7,992 | MMBtu | $2.52 |
TOTAL ENERGY COSTS | $315,687 | |||
RECOMMENDED SAVINGS* | $16,783 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,975 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Water Disposal | Administrative Changes | Electricity Usage | Fuel Oil #6 | Water Disposal | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,400 Cost: $13,150 |
$4,400 | 33,998 | - | - | - | - | - | - |
$4,400 33,998 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,692 Cost: $12,175 |
$3,692 | 41,325 | - | - | - | - | - | - |
$3,692 41,325 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,800 Cost: $340 |
$3,800 | 39,566 | - | - | - | - | - | - |
$3,800 39,566 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,483 Cost: $4,500 |
$1,795 | 21,688 | $(-312) | (-92) | - | - | - | - |
$1,795 21,688 kWh |
$(-312) (-92) MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $1,175 Cost: $45 |
$1,175 | 11,723 | - | - | - | - | - | - |
$1,175 11,723 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,009 Cost: $2,500 |
- | - | $1,009 | 420 | - | - | - | - |
- - kWh |
$1,009 420 MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $574 Cost: - |
- | - | - | - | - | - | $574 | - |
- - kWh |
- - MMBtu |
- - Tgal |
$574 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7314 REDUCE VENTILATION AIR |
Savings: $128 Cost: - |
$128 | 1,172 | - | - | - | - | - | - |
$128 1,172 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $522 Cost: $1,547 |
- | - | $49 | 22 | $473 | 45,360 | - | - |
- - kWh |
$49 22 MMBtu |
$473 45,360 Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $16,783 Cost: $34,257 |
$14,990 | 149,472 | $746 | 350 | $473 | 45,360 | $574 | - | $14,990 149,472 kWh |
$746 350 MMBtu |
$473 45,360 Tgal |
$574 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,975 Cost: $385 |
$4,975 | 51,289 | - | - | - | - | - | - | $4,975 51,289 kWh |
- - MMBtu |
- - Tgal |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||