IAC logo
IAC Assessment: ME0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Frozen Potato Products
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 625,000
Annual Production 200,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,405,601 35,946,659 kWh $0.07
Fuel Oil #6 $778,864 308,673 MMBtu $2.52
TOTAL ENERGY COSTS $3,184,465
RECOMMENDED SAVINGS* $52,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,529
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$22,418
Cost:
-
- - - - $22,418 - -
-
kWh
-
-
MMBtu
$22,418
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$9,670
Cost:
-
- - - - $9,670 - -
-
kWh
-
-
MMBtu
$9,670
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,400
Cost:
-
- - - - $7,400 - -
-
kWh
-
-
MMBtu
$7,400
-
$
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$5,257
Cost:
$400
- - $5,257 2,070 - - -
-
kWh
$5,257
2,070
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,540
Cost:
$8,745
$3,674 77,081 $(-134) (-52) - - $3,674
77,081
kWh
$(-134)
(-52)
MMBtu
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,575
Cost:
$300
$3,575 54,513 - - - - $3,575
54,513
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$466
Cost:
$750
- - $466 171 - - -
-
kWh
$466
171
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$52,326
Cost:
$10,195
$7,249 131,594 $5,589 2,189 $39,488 - $7,249
131,594
kWh
$5,589
2,189
MMBtu
$39,488
-
$
TOTAL IMPLEMENTED Savings:
$43,529
Cost:
$1,050
$3,575 54,513 $466 171 $39,488 - $3,575
54,513
kWh
$466
171
MMBtu
$39,488
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #6 Administrative Changes Electricity Usage Fuel Oil #6 Administrative Changes