Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1995 |
Principal Product | Modified Starches |
NAICS | n/a |
SIC | 2046 - Wet Corn Milling |
Sales | $10,000,000-$50,000,000 |
# of Employees | 56 |
Plant Area (Sq.Ft.) | 163,000 |
Annual Production | 32,603,315 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $368,349 | 5,411,196 | kWh | $0.07 |
Fuel Oil #6 | $257,629 | 93,333 | MMBtu | $2.76 |
TOTAL ENERGY COSTS | $681,258 | |||
RECOMMENDED SAVINGS* | $37,371 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,884 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #6 | Water Disposal | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,234 Cost: $11,219 |
$8,234 | 71,219 | - | - | - | - | - | - |
$8,234 71,219 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,730 Cost: $300 |
$1,730 | 25,498 | - | - | - | - | - | - |
$1,730 25,498 kWh |
- - MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,668 Cost: $400 |
- | - | $1,668 | 602 | - | - | - | - |
- - kWh |
$1,668 602 MMBtu |
- - Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $22,542 Cost: $32,000 |
$17,274 | 253,224 | - | - | $5,268 | 2,800,000 | - | - |
$17,274 253,224 kWh |
- - MMBtu |
$5,268 2,800,000 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED |
Savings: $1,253 Cost: $1,690 |
- | - | $1,145 | 413 | $108 | 80,541 | - | - |
- - kWh |
$1,145 413 MMBtu |
$108 80,541 Tgal |
- - lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $1,080 Cost: $200 |
- | - | - | - | - | - | $1,080 | 36,000 |
- - kWh |
- - MMBtu |
- - Tgal |
$1,080 36,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $864 Cost: - |
- | - | - | - | - | - | $864 | 26,000 |
- - kWh |
- - MMBtu |
- - Tgal |
$864 26,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,371 Cost: $45,809 |
$27,238 | 349,941 | $2,813 | 1,015 | $5,376 | 2,880,541 | $1,944 | 62,000 | $27,238 349,941 kWh |
$2,813 1,015 MMBtu |
$5,376 2,880,541 Tgal |
$1,944 62,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,884 Cost: $32,900 |
$19,004 | 278,722 | $1,668 | 602 | $5,268 | 2,800,000 | $1,944 | 62,000 | $19,004 278,722 kWh |
$1,668 602 MMBtu |
$5,268 2,800,000 Tgal |
$1,944 62,000 lb |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Water Disposal | Solid Waste (non-haz) | Electricity Usage | Fuel Oil #6 | Water Disposal | Solid Waste (non-haz) |