IAC Assessment: ME0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Modified Starches
NAICS n/a
SIC 2046 - Wet Corn Milling
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 163,000
Annual Production 32,603,315 Pounds
Production Hrs. Annual 8,400
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $368,349 5,411,196 kWh $0.07
Fuel Oil #6 $257,629 93,333 MMBtu $2.76
TOTAL ENERGY COSTS $681,258
RECOMMENDED SAVINGS* $37,371 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,884
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Water Disposal Solid Waste (non-haz) Electricity Usage Fuel Oil #6 Water Disposal Solid Waste (non-haz)
$ kWh $ MMBtu $ Tgal $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,234
Cost:
$11,219
$8,234 71,219 - - - - - - $8,234
71,219
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,730
Cost:
$300
$1,730 25,498 - - - - - - $1,730
25,498
kWh
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,668
Cost:
$400
- - $1,668 602 - - - - -
-
kWh
$1,668
602
MMBtu
-
-
Tgal
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$22,542
Cost:
$32,000
$17,274 253,224 - - $5,268 2,800,000 - - $17,274
253,224
kWh
-
-
MMBtu
$5,268
2,800,000
Tgal
-
-
lb
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$1,253
Cost:
$1,690
- - $1,145 413 $108 80,541 - - -
-
kWh
$1,145
413
MMBtu
$108
80,541
Tgal
-
-
lb
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,080
Cost:
$200
- - - - - - $1,080 36,000 -
-
kWh
-
-
MMBtu
-
-
Tgal
$1,080
36,000
lb
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$864
Cost:
-
- - - - - - $864 26,000 -
-
kWh
-
-
MMBtu
-
-
Tgal
$864
26,000
lb
TOTAL RECOMMENDED Savings:
$37,371
Cost:
$45,809
$27,238 349,941 $2,813 1,015 $5,376 2,880,541 $1,944 62,000 $27,238
349,941
kWh
$2,813
1,015
MMBtu
$5,376
2,880,541
Tgal
$1,944
62,000
lb
TOTAL IMPLEMENTED Savings:
$27,884
Cost:
$32,900
$19,004 278,722 $1,668 602 $5,268 2,800,000 $1,944 62,000 $19,004
278,722
kWh
$1,668
602
MMBtu
$5,268
2,800,000
Tgal
$1,944
62,000
lb
Savings
Cost
$ kWh $ MMBtu $ Tgal $ lb
Electricity Usage Fuel Oil #6 Water Disposal Solid Waste (non-haz) Electricity Usage Fuel Oil #6 Water Disposal Solid Waste (non-haz)