IAC logo
IAC Assessment: ME0169
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0169
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1995
Principal Product Textiles
NAICS n/a
SIC 2542 - Partitions And Fixtures, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 1,175
Plant Area (Sq.Ft.) 423,712
Annual Production 9,308,000 Pounds
Production Hrs. Annual 6,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,451,047 16,418,816 kWh $0.09
Fuel Oil #2 $16,443 3,877 MMBtu $4.24
Wood $238,045 160,381 MMBtu $1.48
TOTAL ENERGY COSTS $1,705,535
RECOMMENDED SAVINGS* $118,115 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,124
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$65,514
Cost:
$27,280
$65,514 358,441 - - - - $65,514
358,441
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,341
Cost:
$28,606
$21,341 274,619 - - - - $21,341
274,619
kWh
-
-
MMBtu
-
-
$
03: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$18,499
Cost:
$75,000
- - - - $18,499 - -
-
kWh
-
-
MMBtu
$18,499
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,642
Cost:
$1,200
$4,642 66,237 - - - - $4,642
66,237
kWh
-
-
MMBtu
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,475
Cost:
$1,000
$3,475 49,824 - - - - $3,475
49,824
kWh
-
-
MMBtu
-
-
$
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$2,205
Cost:
$400
- - $2,205 1,480 - - -
-
kWh
$2,205
1,480
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,520
Cost:
-
$1,520 24,033 - - - - $1,520
24,033
kWh
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$919
Cost:
$1,000
$919 13,189 - - - - $919
13,189
kWh
-
-
MMBtu
-
-
$
09: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$118,115
Cost:
$134,486
$97,411 786,343 $2,205 1,480 $18,499 - $97,411
786,343
kWh
$2,205
1,480
MMBtu
$18,499
-
$
TOTAL IMPLEMENTED Savings:
$3,124
Cost:
$1,400
$919 13,189 $2,205 1,480 - - $919
13,189
kWh
$2,205
1,480
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes