IAC Assessment: ME0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Tungston Wire Cores
NAICS n/a
SIC 3699 - Electrical Equipment & Supplies, Nec
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 210,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 7,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,757,440 26,023,447 kWh $0.07
Electricity Demand $324,749 54,534 kW-months/year $5.95
Electricity Fees $60,925 - $ -
Natural Gas $348,272 61,767 MMBtu $5.64
LPG $167,522 32,346 MMBtu $5.18
Fuel Oil #2 $24,768 6,090 MMBtu $4.07
TOTAL ENERGY COSTS $2,683,676
RECOMMENDED SAVINGS* $150,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,802
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$58,152
Cost:
$127,000
- - - - - - $58,152 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$58,152
-
$
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$40,938
Cost:
$4,108
$40,938 584,994 - - - - - - $40,938
584,994
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$26,743
Cost:
$600
- - - - $26,743 5,133 - - -
-
kWh
-
-
kW-months/year
$26,743
5,133
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$13,452
Cost:
$308
- - - - $13,452 2,582 - - -
-
kWh
-
-
kW-months/year
$13,452
2,582
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,440
Cost:
$18,689
$7,292 105,510 $1,148 189 - - - - $7,292
105,510
kWh
$1,148
189
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,521
Cost:
$2,761
- - - - $1,521 292 - - -
-
kWh
-
-
kW-months/year
$1,521
292
MMBtu
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$646
Cost:
$1,118
$1,067 15,240 - - $(-421) (-108) - - $1,067
15,240
kWh
-
-
kW-months/year
$(-421)
(-108)
MMBtu
-
-
$
08: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$570
Cost:
$530
- - - - $570 110 - - -
-
kWh
-
-
kW-months/year
$570
110
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$150,462
Cost:
$155,114
$49,297 705,744 $1,148 189 $41,865 8,009 $58,152 - $49,297
705,744
kWh
$1,148
189
kW-months/year
$41,865
8,009
MMBtu
$58,152
-
$
TOTAL IMPLEMENTED Savings:
$50,802
Cost:
$23,476
$8,359 120,750 $1,148 189 $41,295 7,899 - - $8,359
120,750
kWh
$1,148
189
kW-months/year
$41,295
7,899
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes