IAC logo
IAC Assessment: ME0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1996
Principal Product Finished Leather
NAICS n/a
SIC 3111 - Leather Tanning And Finishing
Sales $10,000,000-$50,000,000
# of Employees 550
Plant Area (Sq.Ft.) 240,000
Annual Production 2,925,000 Pieces
Production Hrs. Annual 5,800
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $887,619 13,377,784 kWh $0.07
Electricity Demand $292,939 28,185 kW-months/year $10.39
Electricity Fees $48,506 - $ -
LPG $61,471 12,689 MMBtu $4.84
Fuel Oil #6 $679,867 203,948 MMBtu $3.33
TOTAL ENERGY COSTS $2,974,571
RECOMMENDED SAVINGS* $159,255 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $120,715
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #6 Water Disposal Administrative Changes Electricity Usage Electricity Demand LPG Fuel Oil #6 Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,559
Cost:
$75,922
$23,834 340,563 $5,725 1,088 - - - - - - - - $23,834
340,563
kWh
$5,725
1,088
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
02: 2.3511 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS Savings:
$18,340
Cost:
$106,350
- - - - - - - - - - $18,340 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$18,340
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,372
Cost:
$350
$14,372 205,451 - - - - - - - - - - $14,372
205,451
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,115
Cost:
$8,175
$12,115 172,919 - - - - - - - - - - $12,115
172,919
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$9,328
Cost:
$4,581
- - - - $49,133 10,151 $(-39,805) (-13,051) - - - - -
-
kWh
-
-
kW-months/year
$49,133
10,151
MMBtu
$(-39,805)
(-13,051)
MMBtu
-
-
Tgal
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$10,872
Cost:
$4,125
$11,225 165,592 $(-353) (-67) - - - - - - - - $11,225
165,592
kWh
$(-353)
(-67)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,368
Cost:
$640
- - - - - - $1,368 571 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,368
571
MMBtu
-
-
Tgal
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,143
Cost:
$570
- - - - - - $1,143 431 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,143
431
MMBtu
-
-
Tgal
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$123
Cost:
$150
$123 1,758 - - - - - - - - - - $123
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
$
10: 3.4151 MINIMIZE WATER USAGE Savings:
$59,250
Cost:
$15,500
- - - - - - - - $59,250 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$59,250
-
Tgal
-
-
$
11: 3.4151 MINIMIZE WATER USAGE Savings:
$2,785
Cost:
$30
- - - - - - - - $2,785 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$2,785
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$159,255
Cost:
$216,393
$61,669 886,283 $5,372 1,021 $49,133 10,151 $(-37,294) (-12,049) $62,035 - $18,340 - $61,669
886,283
kWh
$5,372
1,021
kW-months/year
$49,133
10,151
MMBtu
$(-37,294)
(-12,049)
MMBtu
$62,035
-
Tgal
$18,340
-
$
TOTAL IMPLEMENTED Savings:
$120,715
Cost:
$101,337
$50,444 720,691 $5,725 1,088 - - $2,511 1,002 $62,035 - - - $50,444
720,691
kWh
$5,725
1,088
kW-months/year
-
-
MMBtu
$2,511
1,002
MMBtu
$62,035
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ $
Electricity Usage Electricity Demand LPG Fuel Oil #6 Water Disposal Administrative Changes Electricity Usage Electricity Demand LPG Fuel Oil #6 Water Disposal Administrative Changes