IAC logo
IAC Assessment: ME0208
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0208
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1997
Principal Product Composite Materials
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 50,000
Annual Production 16,000,000 Pounds
Production Hrs. Annual 7,696
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,452 819,754 kWh $0.08
Electricity Demand $16,005 2,014 kW-months/year $7.95
Electricity Fees $3,399 - $ -
LPG $13,679 1,704 MMBtu $8.03
TOTAL ENERGY COSTS $98,567
RECOMMENDED SAVINGS* $35,716 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,675
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,030
Cost:
$600
$3,030 43,376 - - - - - - - - - - $3,030
43,376
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,766
Cost:
$20
$2,766 39,566 - - - - - - - - - - $2,766
39,566
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,949
Cost:
$3,274
$1,949 27,843 - - - - - - - - - - $1,949
27,843
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,220
Cost:
-
- - - - - - - - $1,220 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$1,220
-
$
-
-
$
05: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$788
Cost:
$290
$788 11,137 - - - - - - - - - - $788
11,137
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$738
Cost:
$200
$738 10,551 - - - - - - - - - - $738
10,551
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$452
Cost:
-
- - - - - - - - $452 - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
$452
-
$
-
-
$
08: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS Savings:
$354
Cost:
-
$217 2,931 $137 16 - - - - - - - - $217
2,931
kWh
$137
16
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
09: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$24,276
Cost:
$6,900
- - - - - - $131 6,000 - - $24,145 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$131
6,000
lb
-
-
$
$24,145
-
$
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$143
Cost:
$400
- - - - $143 - - - - - - - -
-
kWh
-
-
kW-months/year
$143
-
Tgal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$35,716
Cost:
$11,684
$9,488 135,404 $137 16 $143 - $131 6,000 $1,672 - $24,145 - $9,488
135,404
kWh
$137
16
kW-months/year
$143
-
Tgal
$131
6,000
lb
$1,672
-
$
$24,145
-
$
TOTAL IMPLEMENTED Savings:
$32,675
Cost:
$8,210
$6,584 94,079 - - $143 - $131 6,000 $1,672 - $24,145 - $6,584
94,079
kWh
-
-
kW-months/year
$143
-
Tgal
$131
6,000
lb
$1,672
-
$
$24,145
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Administrative Changes Ancillary Material Cost