Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | Composite Materials |
NAICS | n/a |
SIC | 2221 - Broadwoven Fabric Mills, Manmade |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 16,000,000 Pounds |
Production Hrs. Annual | 7,696 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $64,452 | 819,754 | kWh | $0.08 |
Electricity Demand | $16,005 | 2,014 | kW-months/year | $7.95 |
Electricity Fees | $3,399 | - | $ | - |
LPG | $13,679 | 1,704 | MMBtu | $8.03 |
TOTAL ENERGY COSTS | $98,567 | |||
RECOMMENDED SAVINGS* | $35,716 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $32,675 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,030 Cost: $600 |
$3,030 | 43,376 | - | - | - | - | - | - | - | - | - | - |
$3,030 43,376 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,766 Cost: $20 |
$2,766 | 39,566 | - | - | - | - | - | - | - | - | - | - |
$2,766 39,566 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,949 Cost: $3,274 |
$1,949 | 27,843 | - | - | - | - | - | - | - | - | - | - |
$1,949 27,843 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $1,220 Cost: - |
- | - | - | - | - | - | - | - | $1,220 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$1,220 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $788 Cost: $290 |
$788 | 11,137 | - | - | - | - | - | - | - | - | - | - |
$788 11,137 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $738 Cost: $200 |
$738 | 10,551 | - | - | - | - | - | - | - | - | - | - |
$738 10,551 kWh |
- - kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $452 Cost: - |
- | - | - | - | - | - | - | - | $452 | - | - | - |
- - kWh |
- - kW-months/year |
- - Tgal |
- - lb |
$452 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.5195 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS |
Savings: $354 Cost: - |
$217 | 2,931 | $137 | 16 | - | - | - | - | - | - | - | - |
$217 2,931 kWh |
$137 16 kW-months/year |
- - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $24,276 Cost: $6,900 |
- | - | - | - | - | - | $131 | 6,000 | - | - | $24,145 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$131 6,000 lb |
- - $ |
$24,145 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $143 Cost: $400 |
- | - | - | - | $143 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$143 - Tgal |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,716 Cost: $11,684 |
$9,488 | 135,404 | $137 | 16 | $143 | - | $131 | 6,000 | $1,672 | - | $24,145 | - | $9,488 135,404 kWh |
$137 16 kW-months/year |
$143 - Tgal |
$131 6,000 lb |
$1,672 - $ |
$24,145 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $32,675 Cost: $8,210 |
$6,584 | 94,079 | - | - | $143 | - | $131 | 6,000 | $1,672 | - | $24,145 | - | $6,584 94,079 kWh |
- - kW-months/year |
$143 - Tgal |
$131 6,000 lb |
$1,672 - $ |
$24,145 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |