Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | Wool Textiles |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 22,500,000 Thousand Feet |
Production Hrs. Annual | 7,280 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $499,534 | 6,784,291 | kWh | $0.07 |
Electricity Demand | $219,221 | 19,603 | kW-months/year | $11.18 |
Electricity Fees | $10,490 | - | $ | - |
LPG | $162,141 | 31,931 | MMBtu | $5.08 |
Fuel Oil #6 | $348,884 | 130,975 | MMBtu | $2.66 |
TOTAL ENERGY COSTS | $1,584,198 | |||
RECOMMENDED SAVINGS* | $46,911 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,641 |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #6 | Water Consumption | Electricity Usage | Fuel Oil #6 | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $17,180 Cost: $12,500 |
$17,180 | 245,311 | - | - | - | - |
$17,180 245,311 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2514 COVER OPEN TANKS |
Savings: $6,034 Cost: $6,233 |
- | - | $6,034 | 2,268 | - | - |
- - kWh |
$6,034 2,268 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,766 Cost: $13,215 |
$4,766 | 49,824 | - | - | - | - |
$4,766 49,824 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,098 Cost: $12,016 |
$4,098 | 48,359 | - | - | - | - |
$4,098 48,359 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,178 Cost: $1,632 |
$2,178 | 26,964 | - | - | - | - |
$2,178 26,964 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,570 Cost: $980 |
- | - | $1,570 | 590 | - | - |
- - kWh |
$1,570 590 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2521 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS |
Savings: $849 Cost: $439 |
- | - | $849 | 255 | - | - |
- - kWh |
$849 255 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $8,286 Cost: $9,600 |
- | - | $7,384 | 3,471 | $902 | - |
- - kWh |
$7,384 3,471 MMBtu |
$902 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION |
Savings: $1,950 Cost: $5,000 |
- | - | - | - | $1,950 | - |
- - kWh |
- - MMBtu |
$1,950 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $46,911 Cost: $61,615 |
$28,222 | 370,458 | $15,837 | 6,584 | $2,852 | - | $28,222 370,458 kWh |
$15,837 6,584 MMBtu |
$2,852 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,641 Cost: $40,782 |
$28,222 | 370,458 | $2,419 | 845 | - | - | $28,222 370,458 kWh |
$2,419 845 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #6 | Water Consumption | Electricity Usage | Fuel Oil #6 | Water Consumption |