IAC logo
IAC Assessment: ME0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1997
Principal Product Compact Discs
NAICS n/a
SIC 3652 - Prerecorded Records And Tapes
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $327,364 4,823,564 kWh $0.07
Electricity Demand $75,050 8,676 kW-months/year $8.65
Electricity Fees $11,693 - $ -
LPG $260 13 MMBtu $20.00
Fuel Oil #2 $24,524 6,195 MMBtu $3.96
TOTAL ENERGY COSTS $443,011
RECOMMENDED SAVINGS* $32,559 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,496
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$9,095
Cost:
$13,750
$7,137 101,993 $698 81 - - - - $1,260 178 - - $7,137
101,993
kWh
$698
81
kW-months/year
-
-
MMBtu
-
-
Tgal
$1,260
178
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,935
Cost:
$32,965
$6,578 94,080 $2,357 273 - - - - - - - - $6,578
94,080
kWh
$2,357
273
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,719
Cost:
$4,446
$4,719 67,409 - - - - - - - - - - $4,719
67,409
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,862
Cost:
$6,000
$3,862 55,100 - - - - - - - - - - $3,862
55,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,648
Cost:
-
$1,648 23,447 - - - - - - - - - - $1,648
23,447
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
06: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$1,398
Cost:
-
- - - - - - - - - - $1,398 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$1,398
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,291
Cost:
-
- - - - - - - - - - $1,291 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$1,291
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$910
Cost:
$2,032
- - - - $910 212 - - - - - - -
-
kWh
-
-
kW-months/year
$910
212
MMBtu
-
-
Tgal
-
-
gal
-
-
$
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$458
Cost:
$1,150
$367 5,275 $91 12 - - - - - - - - $367
5,275
kWh
$91
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
-
-
$
10: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$16
Cost:
-
- - - - - - - - - - $16 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
$16
-
$
11: 3.6125 SELL COMBUSTIBLE WASTE Savings:
$150
Cost:
-
- - - - - - - - $150 220 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$150
220
gal
-
-
$
12: 3.4155 METER WASTE WATER Savings:
$77
Cost:
$424
- - - - - - $77 45,619 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$77
45,619
Tgal
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$32,559
Cost:
$60,767
$24,311 347,304 $3,146 366 $910 212 $77 45,619 $1,410 398 $2,705 - $24,311
347,304
kWh
$3,146
366
kW-months/year
$910
212
MMBtu
$77
45,619
Tgal
$1,410
398
gal
$2,705
-
$
TOTAL IMPLEMENTED Savings:
$26,496
Cost:
$52,735
$20,449 292,204 $3,146 366 - - $77 45,619 $1,410 398 $1,414 - $20,449
292,204
kWh
$3,146
366
kW-months/year
-
-
MMBtu
$77
45,619
Tgal
$1,410
398
gal
$1,414
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal $ $
Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Other Liquid (haz) Administrative Changes