Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1997 |
Principal Product | dowels and glue pins |
NAICS | n/a |
SIC | 2499 - Wood Products, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 37,500 |
Annual Production | 434,477,628 Pieces |
Production Hrs. Annual | 2,520 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $5,691 | 84,115 | kWh | $0.07 |
Electricity Demand | $25,791 | 3,112 | kW-months/year | $8.29 |
Electricity Fees | $6,105 | - | $ | - |
Fuel Oil #2 | $5,140 | 658 | MMBtu | $7.81 |
Wood | $49,985 | 37,139 | MMBtu | $1.35 |
TOTAL ENERGY COSTS | $97,023 | |||
RECOMMENDED SAVINGS* | $26,817 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Wood | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $12,527 Cost: $20,000 |
$12,527 | 178,781 | - | - | - | - | - | - | - | - |
$12,527 178,781 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,057 Cost: $8,690 |
$4,017 | 57,444 | $2,040 | 193 | - | - | - | - | - | - |
$4,017 57,444 kWh |
$2,040 193 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,029 Cost: $1,380 |
- | - | - | - | $2,029 | 1,230 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,029 1,230 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $879 Cost: - |
- | - | - | - | - | - | - | - | $879 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$879 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $683 Cost: $1,230 |
$563 | 8,206 | $120 | 14 | - | - | - | - | - | - |
$563 8,206 kWh |
$120 14 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $331 Cost: $185 |
$331 | 4,689 | - | - | - | - | - | - | - | - |
$331 4,689 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $4,311 Cost: $986 |
- | - | - | - | - | - | $4,311 | 10,600 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,311 10,600 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,817 Cost: $32,471 |
$17,438 | 249,120 | $2,160 | 207 | $2,029 | 1,230 | $4,311 | 10,600 | $879 | - | $17,438 249,120 kWh |
$2,160 207 kW-months/year |
$2,029 1,230 MMBtu |
$4,311 10,600 lb |
$879 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Wood | Solid Waste (non-haz) | Administrative Changes |