IAC Assessment: ME0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product wood turnings
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 55
Plant Area (Sq.Ft.) 15,400
Annual Production 800,000 Thousand Feet
Production Hrs. Annual 2,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,579 1,222,157 kWh $0.06
Electricity Demand $38,259 5,346 kW-months/year $7.16
Electricity Fees $407 - $ -
Fuel Oil #2 $3,732 475 MMBtu $7.86
Wood $1,500 1,039 MMBtu $1.44
TOTAL ENERGY COSTS $123,374
RECOMMENDED SAVINGS* $16,739 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,937
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Solid Waste (haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,324
Cost:
$1,486
$1,046 17,585 $4,278 60 - - - - - - - - $1,046
17,585
kWh
$4,278
60
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$1,365
Cost:
$874
$1,365 22,860 - - - - - - - - - - $1,365
22,860
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$914
Cost:
$200
$914 15,240 - - - - - - - - - - $914
15,240
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$630
Cost:
-
- - - - - - - - $630 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$630
-
$
-
-
$
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$408
Cost:
-
- - - - - - - - $408 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$408
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$309
Cost:
$1,678
$265 4,396 $44 12 - - - - - - - - $265
4,396
kWh
$44
12
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$350
Cost:
$75
$350 5,862 - - - - - - - - - - $350
5,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$218
Cost:
$680
$218 3,517 - - - - - - - - - - $218
3,517
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$332
Cost:
$215
- - - - $332 163 - - - - - - -
-
kWh
-
-
kW-months/year
$332
163
MMBtu
-
-
lb
-
-
$
-
-
$
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,614
Cost:
$740
- - - - - - - - - - $4,614 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$4,614
-
$
11: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$2,275
Cost:
$5,748
- - - - - - $592 436 - - $1,683 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$592
436
lb
-
-
$
$1,683
-
$
TOTAL RECOMMENDED Savings:
$16,739
Cost:
$11,696
$4,158 69,460 $4,322 72 $332 163 $592 436 $1,038 - $6,297 - $4,158
69,460
kWh
$4,322
72
kW-months/year
$332
163
MMBtu
$592
436
lb
$1,038
-
$
$6,297
-
$
TOTAL IMPLEMENTED Savings:
$13,937
Cost:
$3,590
$3,675 61,547 $4,278 60 $332 163 - - $1,038 - $4,614 - $3,675
61,547
kWh
$4,278
60
kW-months/year
$332
163
MMBtu
-
-
lb
$1,038
-
$
$4,614
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Wood Solid Waste (haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Wood Solid Waste (haz) Administrative Changes Ancillary Material Cost