IAC Assessment: ME0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product Hardwood Flooring
NAICS n/a
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 550,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,240
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $246,691 3,456,038 kWh $0.07
Electricity Demand $79,588 8,020 kW-months/year $9.92
Electricity Fees $5,056 - $ -
Natural Gas $6,882 755 MMBtu $9.12
TOTAL ENERGY COSTS $347,175
RECOMMENDED SAVINGS* $89,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,899
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Water Consumption Primary Product By-product Production
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ lb $ $ $ Tgal $ $ $ $
01: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$38,400
Cost:
$50,000
- - - - - - - - - - - - $38,400 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
$38,400
-
$
-
-
Tgal
-
-
$
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$19,979
Cost:
$12,932
$5,040 71,805 $1,431 144 $(-2,136) (-240) - - - - - - $15,644 - - - - - - - $5,040
71,805
kWh
$1,431
144
kW-months/year
$(-2,136)
(-240)
MMBtu
-
-
gal
-
-
gal
-
-
lb
$15,644
-
$
-
-
Tgal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,153
Cost:
$10,580
$6,364 90,856 $1,789 180 - - - - - - - - - - - - - - - - $6,364
90,856
kWh
$1,789
180
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,482
Cost:
$4,476
$3,826 48,652 $656 66 - - - - - - - - - - - - - - - - $3,826
48,652
kWh
$656
66
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,284
Cost:
$800
$2,284 32,532 - - - - - - - - - - - - - - - - - - $2,284
32,532
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$975
Cost:
$500
$975 14,068 - - - - - - - - - - - - - - - - - - $975
14,068
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
-
-
$
07: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$12,512
Cost:
$12,000
$(-3,675) (-52,755) $(-894) (-90) - - $12,627 2,056,600 - - - - - - $4,454 - - - - - $(-3,675)
(-52,755)
kWh
$(-894)
(-90)
kW-months/year
-
-
MMBtu
$12,627
2,056,600
gal
-
-
gal
-
-
lb
-
-
$
$4,454
-
Tgal
-
-
$
-
-
$
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$150
Cost:
-
- - - - - - - - - - - - - - - - - - $150 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
-
-
lb
-
-
$
-
-
Tgal
-
-
$
$150
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,887
Cost:
$3,000
- - - - - - - - - - $1,887 66 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
gal
$1,887
66
lb
-
-
$
-
-
Tgal
-
-
$
-
-
$
10: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID Savings:
$1,114
Cost:
$7,000
$654 9,086 $357 36 - - - - $9 25 - - - - - - $94 - - - $654
9,086
kWh
$357
36
kW-months/year
-
-
MMBtu
-
-
gal
$9
25
gal
-
-
lb
-
-
$
-
-
Tgal
$94
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$89,936
Cost:
$101,288
$15,468 214,244 $3,339 336 $(-2,136) (-240) $12,627 2,056,600 $9 25 $1,887 66 $54,044 - $4,454 - $94 - $150 - $15,468
214,244
kWh
$3,339
336
kW-months/year
$(-2,136)
(-240)
MMBtu
$12,627
2,056,600
gal
$9
25
gal
$1,887
66
lb
$54,044
-
$
$4,454
-
Tgal
$94
-
$
$150
-
$
TOTAL IMPLEMENTED Savings:
$87,899
Cost:
$98,288
$15,468 214,244 $3,339 336 $(-2,136) (-240) $12,627 2,056,600 $9 25 - - $54,044 - $4,454 - $94 - - - $15,468
214,244
kWh
$3,339
336
kW-months/year
$(-2,136)
(-240)
MMBtu
$12,627
2,056,600
gal
$9
25
gal
-
-
lb
$54,044
-
$
$4,454
-
Tgal
$94
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ gal $ lb $ $ $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Water Consumption Primary Product By-product Production Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Other Liquid (haz) Solid Waste (haz) Administrative Changes Water Consumption Primary Product By-product Production