Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1998 |
Principal Product | Hardwood Flooring |
NAICS | n/a |
SIC | 3545 - Machine Tool Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 550,000 |
Annual Production | 2,147,483,647 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $246,691 | 3,456,038 | kWh | $0.07 |
Electricity Demand | $79,588 | 8,020 | kW-months/year | $9.92 |
Electricity Fees | $5,056 | - | $ | - |
Natural Gas | $6,882 | 755 | MMBtu | $9.12 |
TOTAL ENERGY COSTS | $347,175 | |||
RECOMMENDED SAVINGS* | $89,936 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $87,899 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Primary Product | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK |
Savings: $38,400 Cost: $50,000 |
- | - | - | - | - | - | - | - | - | - | - | - | $38,400 | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
$38,400 - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $19,979 Cost: $12,932 |
$5,040 | 71,805 | $1,431 | 144 | $(-2,136) | (-240) | - | - | - | - | - | - | $15,644 | - | - | - | - | - | - | - |
$5,040 71,805 kWh |
$1,431 144 kW-months/year |
$(-2,136) (-240) MMBtu |
- - gal |
- - gal |
- - lb |
$15,644 - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,153 Cost: $10,580 |
$6,364 | 90,856 | $1,789 | 180 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$6,364 90,856 kWh |
$1,789 180 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $4,482 Cost: $4,476 |
$3,826 | 48,652 | $656 | 66 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$3,826 48,652 kWh |
$656 66 kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,284 Cost: $800 |
$2,284 | 32,532 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$2,284 32,532 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $975 Cost: $500 |
$975 | 14,068 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - |
$975 14,068 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $12,512 Cost: $12,000 |
$(-3,675) | (-52,755) | $(-894) | (-90) | - | - | $12,627 | 2,056,600 | - | - | - | - | - | - | $4,454 | - | - | - | - | - |
$(-3,675) (-52,755) kWh |
$(-894) (-90) kW-months/year |
- - MMBtu |
$12,627 2,056,600 gal |
- - gal |
- - lb |
- - $ |
$4,454 - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $150 Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | $150 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
- - lb |
- - $ |
- - Tgal |
- - $ |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $1,887 Cost: $3,000 |
- | - | - | - | - | - | - | - | - | - | $1,887 | 66 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - gal |
$1,887 66 lb |
- - $ |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5146 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID |
Savings: $1,114 Cost: $7,000 |
$654 | 9,086 | $357 | 36 | - | - | - | - | $9 | 25 | - | - | - | - | - | - | $94 | - | - | - |
$654 9,086 kWh |
$357 36 kW-months/year |
- - MMBtu |
- - gal |
$9 25 gal |
- - lb |
- - $ |
- - Tgal |
$94 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $89,936 Cost: $101,288 |
$15,468 | 214,244 | $3,339 | 336 | $(-2,136) | (-240) | $12,627 | 2,056,600 | $9 | 25 | $1,887 | 66 | $54,044 | - | $4,454 | - | $94 | - | $150 | - | $15,468 214,244 kWh |
$3,339 336 kW-months/year |
$(-2,136) (-240) MMBtu |
$12,627 2,056,600 gal |
$9 25 gal |
$1,887 66 lb |
$54,044 - $ |
$4,454 - Tgal |
$94 - $ |
$150 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $87,899 Cost: $98,288 |
$15,468 | 214,244 | $3,339 | 336 | $(-2,136) | (-240) | $12,627 | 2,056,600 | $9 | 25 | - | - | $54,044 | - | $4,454 | - | $94 | - | - | - | $15,468 214,244 kWh |
$3,339 336 kW-months/year |
$(-2,136) (-240) MMBtu |
$12,627 2,056,600 gal |
$9 25 gal |
- - lb |
$54,044 - $ |
$4,454 - Tgal |
$94 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | gal | $ | lb | $ | $ | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Primary Product | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (non-haz) | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Water Consumption | Primary Product | By-product Production |