Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1998 |
Principal Product | baked beans |
NAICS | n/a |
SIC | 2032 - Canned Specialties |
Sales | >$500,000,000 |
# of Employees | 210 |
Plant Area (Sq.Ft.) | 107,000 |
Annual Production | 648,000,000 Pieces |
Production Hrs. Annual | 4,992 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $173,802 | 2,368,992 | kWh | $0.07 |
Electricity Demand | $60,821 | 10,274 | kW-months/year | $5.92 |
Electricity Fees | $11,642 | - | $ | - |
Natural Gas | $230,867 | 60,509 | MMBtu | $3.82 |
Fuel Oil #6 | $242,370 | 76,942 | MMBtu | $3.15 |
TOTAL ENERGY COSTS | $719,502 | |||
RECOMMENDED SAVINGS* | $102,612 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,516 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Disposal | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,669 Cost: $38,422 |
$12,994 | 185,815 | $1,675 | 283 | - | - | - | - | - | - | - | - | - | - |
$12,994 185,815 kWh |
$1,675 283 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $12,523 Cost: $22,943 |
- | - | - | - | $12,523 | 2,023 | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$12,523 2,023 MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $14,710 Cost: $12,260 |
- | - | - | - | - | - | $14,710 | 3,884 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$14,710 3,884 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $5,602 Cost: $7,719 |
$(-2,209) | (-31,360) | $(-509) | (-86) | - | - | - | - | - | - | $8,320 | - | - | - |
$(-2,209) (-31,360) kWh |
$(-509) (-86) kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$8,320 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,877 Cost: $500 |
$1,877 | 26,671 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,877 26,671 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $444 Cost: $804 |
$366 | 5,275 | $78 | 13 | - | - | - | - | - | - | - | - | - | - |
$366 5,275 kWh |
$78 13 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $214 Cost: $250 |
$214 | 2,931 | - | - | - | - | - | - | - | - | - | - | - | - |
$214 2,931 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4115 RECOVER AND REUSE COOLING WATER |
Savings: $47,833 Cost: $131,000 |
$(-11,850) | (-168,816) | $(-3,167) | (-535) | - | - | - | - | - | - | $(-8,150) | - | $71,000 | - |
$(-11,850) (-168,816) kWh |
$(-3,167) (-535) kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$(-8,150) - $ |
$71,000 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $2,419 Cost: $8,000 |
$(-875) | (-12,603) | - | - | - | - | - | - | $2,904 | 495,425 | - | - | $390 | - |
$(-875) (-12,603) kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$2,904 495,425 Tgal |
- - $ |
$390 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.4158 USE MINIMUM COOLING WATER TO BEARINGS |
Savings: $2,321 Cost: $4,200 |
- | - | - | - | - | - | $1,835 | 605 | - | - | - | - | $486 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,835 605 MMBtu |
- - Tgal |
- - $ |
$486 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $102,612 Cost: $226,098 |
$517 | 7,913 | $(-1,923) | (-325) | $12,523 | 2,023 | $16,545 | 4,489 | $2,904 | 495,425 | $170 | - | $71,876 | - | $517 7,913 kWh |
$(-1,923) (-325) kW-months/year |
$12,523 2,023 MMBtu |
$16,545 4,489 MMBtu |
$2,904 495,425 Tgal |
$170 - $ |
$71,876 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,516 Cost: $59,955 |
$13,242 | 189,332 | $1,244 | 210 | - | - | $14,710 | 3,884 | - | - | $8,320 | - | - | - | $13,242 189,332 kWh |
$1,244 210 kW-months/year |
- - MMBtu |
$14,710 3,884 MMBtu |
- - Tgal |
$8,320 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #6 | Water Disposal | Administrative Changes | Water Consumption |