IAC Assessment: ME0252
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0252
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product dry wall board
NAICS n/a
SIC 3275 - Gypsum Products
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 205,000
Annual Production 325,000,000 Thousand Feet
Production Hrs. Annual 8,384
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,464,369 15,328,253 kWh $0.10
Electricity Demand $241,628 29,265 kW-months/year $8.26
Electricity Fees $6,022 - $ -
Natural Gas $3,211,391 745,188 MMBtu $4.31
Fuel Oil #2 $11,191 2,843 MMBtu $3.94
TOTAL ENERGY COSTS $4,934,601
RECOMMENDED SAVINGS* $194,208 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $188,862
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material By-product Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$67,656
Cost:
$52,600
- - - - $67,656 15,929 - - - - -
-
kWh
-
-
kW-months/year
$67,656
15,929
MMBtu
-
-
$
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,186
Cost:
$28,000
$15,186 162,954 - - - - - - - - $15,186
162,954
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$10,928
Cost:
$2,675
$10,928 130,129 - - - - - - - - $10,928
130,129
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,866
Cost:
$6,900
- - - - $4,866 1,129 - - - - -
-
kWh
-
-
kW-months/year
$4,866
1,129
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,171
Cost:
$1,923
$1,853 23,154 $318 39 - - - - - - $1,853
23,154
kWh
$318
39
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,309
Cost:
$1,457
$1,148 14,361 $161 20 - - - - - - $1,148
14,361
kWh
$161
20
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,213
Cost:
$1,405
$1,016 12,603 $446 54 $(-249) (-58) - - - - $1,016
12,603
kWh
$446
54
kW-months/year
$(-249)
(-58)
MMBtu
-
-
$
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$466
Cost:
$225
$466 8,792 - - - - - - - - $466
8,792
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$233
Cost:
$375
$233 2,931 - - - - - - - - $233
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 4.2220 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW Savings:
$89,700
Cost:
$11,750
- - - - - - $89,700 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$89,700
-
$
-
-
$
11: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$480
Cost:
-
- - - - - - - - $480 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$480
-
$
TOTAL RECOMMENDED Savings:
$194,208
Cost:
$107,310
$30,830 354,924 $925 113 $72,273 17,000 $89,700 - $480 - $30,830
354,924
kWh
$925
113
kW-months/year
$72,273
17,000
MMBtu
$89,700
-
$
$480
-
$
TOTAL IMPLEMENTED Savings:
$188,862
Cost:
$100,410
$30,830 354,924 $925 113 $67,407 15,871 $89,700 - - - $30,830
354,924
kWh
$925
113
kW-months/year
$67,407
15,871
MMBtu
$89,700
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material By-product Production Electricity Usage Electricity Demand Natural Gas Primary Raw Material By-product Production