Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1998 |
Principal Product | ball valves and actuators |
NAICS | n/a |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 87,500 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 4,125 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $69,746 | 565,944 | kWh | $0.12 |
Electricity Demand | $16,719 | 2,022 | kW-months/year | $8.27 |
LPG | $17,919 | 2,531 | MMBtu | $7.08 |
TOTAL ENERGY COSTS | $118,757 | |||
RECOMMENDED SAVINGS* | $26,969 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Other Liquid (haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | Other Liquid (haz) | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,883 Cost: $25,900 |
$6,973 | 77,374 | $1,910 | 231 | - | - | - | - | - | - |
$6,973 77,374 kWh |
$1,910 231 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,601 Cost: $14,083 |
$986 | 10,844 | $615 | 74 | - | - | - | - | - | - |
$986 10,844 kWh |
$615 74 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $1,320 Cost: $2,600 |
$578 | 4,689 | $893 | 108 | $(-151) | (-20) | - | - | - | - |
$578 4,689 kWh |
$893 108 kW-months/year |
$(-151) (-20) MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $911 Cost: $450 |
$881 | 9,672 | $446 | 54 | $(-416) | (-55) | - | - | - | - |
$881 9,672 kWh |
$446 54 kW-months/year |
$(-416) (-55) MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $830 Cost: $500 |
$830 | 9,086 | - | - | - | - | - | - | - | - |
$830 9,086 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $304 Cost: $300 |
$304 | 3,224 | - | - | - | - | - | - | - | - |
$304 3,224 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL |
Savings: $6,872 Cost: $17,050 |
- | - | - | - | $(-1,295) | (-136) | $8,167 | - | - | - |
- - kWh |
- - kW-months/year |
$(-1,295) (-136) MMBtu |
$8,167 - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS |
Savings: $6,248 Cost: $6,950 |
- | - | - | - | - | - | - | - | $6,248 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$6,248 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $26,969 Cost: $67,833 |
$10,552 | 114,889 | $3,864 | 467 | $(-1,862) | (-211) | $8,167 | - | $6,248 | - | $10,552 114,889 kWh |
$3,864 467 kW-months/year |
$(-1,862) (-211) MMBtu |
$8,167 - gal |
$6,248 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Other Liquid (haz) | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | LPG | Other Liquid (haz) | One-time Revenue or Avoided Cost |