IAC logo
IAC Assessment: ME0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1998
Principal Product ball valves and actuators
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $5,000,000-$10,000,000
# of Employees 45
Plant Area (Sq.Ft.) 87,500
Annual Production 100,000 Pieces
Production Hrs. Annual 4,125
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,746 565,944 kWh $0.12
Electricity Demand $16,719 2,022 kW-months/year $8.27
LPG $17,919 2,531 MMBtu $7.08
TOTAL ENERGY COSTS $118,757
RECOMMENDED SAVINGS* $26,969 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Other Liquid (haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG Other Liquid (haz) One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,883
Cost:
$25,900
$6,973 77,374 $1,910 231 - - - - - - $6,973
77,374
kWh
$1,910
231
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,601
Cost:
$14,083
$986 10,844 $615 74 - - - - - - $986
10,844
kWh
$615
74
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,320
Cost:
$2,600
$578 4,689 $893 108 $(-151) (-20) - - - - $578
4,689
kWh
$893
108
kW-months/year
$(-151)
(-20)
MMBtu
-
-
gal
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$911
Cost:
$450
$881 9,672 $446 54 $(-416) (-55) - - - - $881
9,672
kWh
$446
54
kW-months/year
$(-416)
(-55)
MMBtu
-
-
gal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$830
Cost:
$500
$830 9,086 - - - - - - - - $830
9,086
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$304
Cost:
$300
$304 3,224 - - - - - - - - $304
3,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
07: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$6,872
Cost:
$17,050
- - - - $(-1,295) (-136) $8,167 - - - -
-
kWh
-
-
kW-months/year
$(-1,295)
(-136)
MMBtu
$8,167
-
gal
-
-
$
08: 3.3133 USE OTHER WASTE CONCENTRATION METHODS Savings:
$6,248
Cost:
$6,950
- - - - - - - - $6,248 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$6,248
-
$
TOTAL RECOMMENDED Savings:
$26,969
Cost:
$67,833
$10,552 114,889 $3,864 467 $(-1,862) (-211) $8,167 - $6,248 - $10,552
114,889
kWh
$3,864
467
kW-months/year
$(-1,862)
(-211)
MMBtu
$8,167
-
gal
$6,248
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand LPG Other Liquid (haz) One-time Revenue or Avoided Cost Electricity Usage Electricity Demand LPG Other Liquid (haz) One-time Revenue or Avoided Cost