IAC Assessment: ME0257
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0257
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product ovens
NAICS n/a
SIC 3589 - Service Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 210
Plant Area (Sq.Ft.) 88,000
Annual Production 15,000 Pieces
Production Hrs. Annual 4,000
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,727 878,664 kWh $0.07
Electricity Demand $31,248 2,812 kW-months/year $11.11
Electricity Fees $4,150 - $ -
Fuel Oil #2 $43,591 7,582 MMBtu $5.75
TOTAL ENERGY COSTS $138,716
RECOMMENDED SAVINGS* $95,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,499
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Primary Raw Material Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,536
Cost:
$21,031
$5,799 67,702 $4,737 522 - - - - - - $5,799
67,702
kWh
$4,737
522
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,900
Cost:
$1,000
$7,900 112,837 - - - - - - - - $7,900
112,837
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 4.731 ADVERTISE PRODUCT OR SERVICE Savings:
$2,993
Cost:
-
- - - - - - $2,993 535 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,993
535
MMBtu
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,980
Cost:
$6,797
- - - - - - $2,980 532 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,980
532
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,268
Cost:
$879
- - - - - - $2,268 316 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,268
316
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$920
Cost:
$20
- - - - $920 45 - - - - -
-
kWh
-
-
kW-months/year
$920
45
MMBtu
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$702
Cost:
$300
- - - - $702 34 - - - - -
-
kWh
-
-
kW-months/year
$702
34
MMBtu
-
-
MMBtu
-
-
$
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$671
Cost:
$1,960
- - - - $671 33 - - - - -
-
kWh
-
-
kW-months/year
$671
33
MMBtu
-
-
MMBtu
-
-
$
09: 3.1192 REDUCE SCRAP PRODUCTION Savings:
$66,200
Cost:
$20,000
- - - - - - - - $66,200 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$66,200
-
$
TOTAL RECOMMENDED Savings:
$95,170
Cost:
$51,987
$13,699 180,539 $4,737 522 $2,293 112 $8,241 1,383 $66,200 - $13,699
180,539
kWh
$4,737
522
kW-months/year
$2,293
112
MMBtu
$8,241
1,383
MMBtu
$66,200
-
$
TOTAL IMPLEMENTED Savings:
$94,499
Cost:
$50,027
$13,699 180,539 $4,737 522 $1,622 79 $8,241 1,383 $66,200 - $13,699
180,539
kWh
$4,737
522
kW-months/year
$1,622
79
MMBtu
$8,241
1,383
MMBtu
$66,200
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Primary Raw Material Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Primary Raw Material