IAC logo
IAC Assessment: ME0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product laths
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 20
Plant Area (Sq.Ft.) 31,613
Annual Production 18,764,150 Pieces
Production Hrs. Annual 1,872
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,450 847,011 kWh $0.07
Electricity Demand $14,500 3,528 kW-months/year $4.11
Electricity Fees $428 - $ -
LPG $1,032 125 MMBtu $8.26
TOTAL ENERGY COSTS $71,410
RECOMMENDED SAVINGS* $205,174 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
01: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$75,000
Cost:
$106,500
- - - - - - - - $75,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$75,000
-
$
-
-
$
-
-
$
02: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$74,945
Cost:
$21,400
- - - - - - - - - - $74,945 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
$74,945
-
$
-
-
$
03: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$20,000
Cost:
$1,200
- - - - - - - - - - - - $20,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
$20,000
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$8,990
Cost:
$295
- - - - $8,990 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$8,990
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,192
Cost:
$8,181
$1,782 21,102 $410 49 - - - - - - - - - - $1,782
21,102
kWh
$410
49
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
06: 4.4440 INSTALL SYSTEM TO COLLECT SCRAP Savings:
$1,300
Cost:
$890
- - - - - - - - - - - - $1,300 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
$1,300
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$715
Cost:
$1,372
$715 7,327 - - - - - - - - - - - - $715
7,327
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$21,564
Cost:
$47,350
- - - - - - $21,564 3,594,000 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$21,564
3,594,000
lb
-
-
$
-
-
$
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$358
Cost:
$1,855
- - - - - - $358 46,666 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$358
46,666
lb
-
-
$
-
-
$
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$110
Cost:
$220
- - - - - - $110 19,333 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$110
19,333
lb
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$205,174
Cost:
$189,263
$2,497 28,429 $410 49 $8,990 - $22,032 3,659,999 $75,000 - $74,945 - $21,300 - $2,497
28,429
kWh
$410
49
kW-months/year
$8,990
-
$
$22,032
3,659,999
lb
$75,000
-
$
$74,945
-
$
$21,300
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material