Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | chlorine |
NAICS | n/a |
SIC | 2819 - Industrial Inorganic Chemicals, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 68 |
Plant Area (Sq.Ft.) | 151,682 |
Annual Production | 65,456 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $400,000 | 8,616,647 | kWh | $0.05 |
Electricity Fees | $1,200 | - | $ | - |
Fuel Oil #2 | $141,591 | 33,225 | MMBtu | $4.26 |
TOTAL ENERGY COSTS | $542,791 | |||
RECOMMENDED SAVINGS* | $43,432 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Fuel Oil #2 | Administrative Changes | Water Consumption | Electricity Usage | Fuel Oil #2 | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $18,075 Cost: $400 |
- | - | $18,075 | 4,243 | - | - | - | - |
- - kWh |
$18,075 4,243 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $13,608 Cost: $48,407 |
$13,608 | 289,566 | - | - | - | - | - | - |
$13,608 289,566 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,246 Cost: $680 |
- | - | $3,246 | 610 | - | - | - | - |
- - kWh |
$3,246 610 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,670 Cost: $100 |
$2,670 | 56,858 | - | - | - | - | - | - |
$2,670 56,858 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,332 Cost: $865 |
- | - | $2,332 | 438 | - | - | - | - |
- - kWh |
$2,332 438 MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $1,883 Cost: - |
- | - | - | - | $1,883 | - | - | - |
- - kWh |
- - MMBtu |
$1,883 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $564 Cost: $1,078 |
$564 | 12,016 | - | - | - | - | - | - |
$564 12,016 kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,054 Cost: $260 |
- | - | $1,026 | 241 | - | - | $28 | - |
- - kWh |
$1,026 241 MMBtu |
- - $ |
$28 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $43,432 Cost: $51,790 |
$16,842 | 358,440 | $24,679 | 5,532 | $1,883 | - | $28 | - | $16,842 358,440 kWh |
$24,679 5,532 MMBtu |
$1,883 - $ |
$28 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Fuel Oil #2 | Administrative Changes | Water Consumption | Electricity Usage | Fuel Oil #2 | Administrative Changes | Water Consumption |