IAC Assessment: ME0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product chlorine
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 68
Plant Area (Sq.Ft.) 151,682
Annual Production 65,456 Tons
Production Hrs. Annual 8,760
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $400,000 8,616,647 kWh $0.05
Electricity Fees $1,200 - $ -
Fuel Oil #2 $141,591 33,225 MMBtu $4.26
TOTAL ENERGY COSTS $542,791
RECOMMENDED SAVINGS* $43,432 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Water Consumption Electricity Usage Fuel Oil #2 Administrative Changes Water Consumption
$ kWh $ MMBtu $ $ $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$18,075
Cost:
$400
- - $18,075 4,243 - - - - -
-
kWh
$18,075
4,243
MMBtu
-
-
$
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$13,608
Cost:
$48,407
$13,608 289,566 - - - - - - $13,608
289,566
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,246
Cost:
$680
- - $3,246 610 - - - - -
-
kWh
$3,246
610
MMBtu
-
-
$
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,670
Cost:
$100
$2,670 56,858 - - - - - - $2,670
56,858
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,332
Cost:
$865
- - $2,332 438 - - - - -
-
kWh
$2,332
438
MMBtu
-
-
$
-
-
Tgal
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,883
Cost:
-
- - - - $1,883 - - - -
-
kWh
-
-
MMBtu
$1,883
-
$
-
-
Tgal
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$564
Cost:
$1,078
$564 12,016 - - - - - - $564
12,016
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
08: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,054
Cost:
$260
- - $1,026 241 - - $28 - -
-
kWh
$1,026
241
MMBtu
-
-
$
$28
-
Tgal
TOTAL RECOMMENDED Savings:
$43,432
Cost:
$51,790
$16,842 358,440 $24,679 5,532 $1,883 - $28 - $16,842
358,440
kWh
$24,679
5,532
MMBtu
$1,883
-
$
$28
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ $ $ Tgal
Electricity Usage Fuel Oil #2 Administrative Changes Water Consumption Electricity Usage Fuel Oil #2 Administrative Changes Water Consumption