Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | diaphrams |
NAICS | n/a |
SIC | 3511 - Turbines And Turbine Generator Sets |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 134,364 |
Annual Production | 3,000 Pieces |
Production Hrs. Annual | 6,604 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $435,538 | 5,477,140 | kWh | $0.08 |
Electricity Demand | $97,444 | 13,175 | kW-months/year | $7.40 |
Electricity Fees | $3,145 | - | $ | - |
LPG | $47,406 | 10,063 | MMBtu | $4.71 |
Fuel Oil #2 | $19,861 | 5,810 | MMBtu | $3.42 |
TOTAL ENERGY COSTS | $630,304 | |||
RECOMMENDED SAVINGS* | $47,001 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,149 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $11,149 Cost: $1,000 |
$11,149 | 139,215 | - | - | - | - | - | - | - | - | - | - |
$11,149 139,215 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,088 Cost: $2,500 |
$4,080 | 50,996 | $3,030 | 408 | $(-1,022) | (-217) | - | - | - | - | - | - |
$4,080 50,996 kWh |
$3,030 408 kW-months/year |
$(-1,022) (-217) MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $3,286 Cost: $613 |
$3,286 | 35,463 | - | - | - | - | - | - | - | - | - | - |
$3,286 35,463 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,025 Cost: $4,646 |
$2,483 | 31,067 | $1,204 | 162 | $(-662) | (-132) | - | - | - | - | - | - |
$2,483 31,067 kWh |
$1,204 162 kW-months/year |
$(-662) (-132) MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.632 CHANGE OPERATING CONDITIONS |
Savings: $2,720 Cost: $950 |
- | - | - | - | - | - | - | - | - | - | $2,720 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
$2,720 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,054 Cost: $3,010 |
$787 | 9,965 | $267 | 36 | - | - | - | - | - | - | - | - |
$787 9,965 kWh |
$267 36 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $615 Cost: - |
- | - | - | - | - | - | - | - | - | - | $615 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
$615 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.231 PURCHASE EQUIPMENT INSTEAD OF LEASING |
Savings: $593 Cost: $1,340 |
- | - | - | - | - | - | - | - | - | - | $593 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
$593 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $296 Cost: $343 |
- | - | - | - | - | - | $296 | 48 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$296 48 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $235 Cost: $437 |
- | - | - | - | - | - | $235 | 36 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$235 36 MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.1192 REDUCE SCRAP PRODUCTION |
Savings: $17,940 Cost: - |
- | - | - | - | - | - | - | - | $17,940 | 9,200,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$17,940 9,200,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,001 Cost: $14,839 |
$21,785 | 266,706 | $4,501 | 606 | $(-1,684) | (-349) | $531 | 84 | $17,940 | 9,200,000 | $3,928 | - | $21,785 266,706 kWh |
$4,501 606 kW-months/year |
$(-1,684) (-349) MMBtu |
$531 84 MMBtu |
$17,940 9,200,000 lb |
$3,928 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,149 Cost: $1,000 |
$11,149 | 139,215 | - | - | - | - | - | - | - | - | - | - | $11,149 139,215 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Administrative Changes |