IAC logo
IAC Assessment: ME0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product French Fries
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 42,209
Annual Production 6,000,000 Pounds
Production Hrs. Annual 1,820
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,506 2,281,360 kWh $0.05
Electricity Demand $99,351 11,505 kW-months/year $8.64
Electricity Fees $7,515 - $ -
Fuel Oil #2 $48,079 13,258 MMBtu $3.63
TOTAL ENERGY COSTS $259,451
RECOMMENDED SAVINGS* $43,805 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,614
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$26,281
Cost:
$10,500
$16,744 239,156 $9,537 3,954 - - - - - - $16,744
239,156
kWh
$9,537
3,954
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,510
Cost:
$6,708
$3,782 53,927 $728 88 - - - - - - $3,782
53,927
kWh
$728
88
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$4,072
Cost:
-
- - - - - - - - $4,072 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,072
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,186
Cost:
$5,825
$1,757 25,205 $844 102 $(-415) (-114) - - - - $1,757
25,205
kWh
$844
102
kW-months/year
$(-415)
(-114)
MMBtu
-
-
lb
-
-
$
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,914
Cost:
$6,370
$1,914 27,257 - - - - - - - - $1,914
27,257
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,176
Cost:
$100
- - - - $1,176 324 - - - - -
-
kWh
-
-
kW-months/year
$1,176
324
MMBtu
-
-
lb
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$740
Cost:
$1,490
- - - - $740 163 - - - - -
-
kWh
-
-
kW-months/year
$740
163
MMBtu
-
-
lb
-
-
$
08: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$636
Cost:
$610
$(-12) (-293) - - $648 148 - - - - $(-12)
(-293)
kWh
-
-
kW-months/year
$648
148
MMBtu
-
-
lb
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$401
Cost:
$85
- - - - $401 88 - - - - -
-
kWh
-
-
kW-months/year
$401
88
MMBtu
-
-
lb
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$277
Cost:
$190
$277 4,103 - - - - - - - - $277
4,103
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
11: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$1,612
Cost:
$300
- - - - - - $1,612 3,750 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,612
3,750
lb
-
-
$
TOTAL RECOMMENDED Savings:
$43,805
Cost:
$32,178
$24,462 349,355 $11,109 4,144 $2,550 609 $1,612 3,750 $4,072 - $24,462
349,355
kWh
$11,109
4,144
kW-months/year
$2,550
609
MMBtu
$1,612
3,750
lb
$4,072
-
$
TOTAL IMPLEMENTED Savings:
$41,614
Cost:
$25,618
$22,271 317,995 $11,109 4,144 $2,550 609 $1,612 3,750 $4,072 - $22,271
317,995
kWh
$11,109
4,144
kW-months/year
$2,550
609
MMBtu
$1,612
3,750
lb
$4,072
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes