IAC Assessment: ME0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1999
Principal Product Woolen goods
NAICS n/a
SIC 2231 - Broadwoven Fabric Mills, Wool
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 400,000
Annual Production 2,700,000 Pieces
Production Hrs. Annual 6,600
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $891,857 10,594,080 kWh $0.08
Electricity Demand $236,066 31,061 kW-months/year $7.60
Electricity Fees $47,911 - $ -
Fuel Oil #6 $115,056 51,175 MMBtu $2.25
TOTAL ENERGY COSTS $1,290,890
RECOMMENDED SAVINGS* $113,775 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,822
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Fuel Oil #6 Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Fuel Oil #2 Fuel Oil #6 Solid Waste (non-haz) Water Consumption
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ Tgal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,778
Cost:
$56,288
$20,400 242,966 $4,378 576 - - - - - - - - $20,400
242,966
kWh
$4,378
576
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$16,324
Cost:
$1,000
$16,324 194,314 - - - - - - - - - - $16,324
194,314
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
03: 4.1140 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$12,357
Cost:
$32,660
- - - - - - $12,357 5,714 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,357
5,714
MMBtu
-
-
lb
-
-
Tgal
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,193
Cost:
$6,570
- - - - - - $11,193 4,975 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,193
4,975
MMBtu
-
-
lb
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,299
Cost:
$10,600
$8,299 98,769 - - - - - - - - - - $8,299
98,769
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$6,530
Cost:
$21,460
- - - - - - $6,530 2,700 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,530
2,700
MMBtu
-
-
lb
-
-
Tgal
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,202
Cost:
$10,069
$5,518 65,651 $684 90 - - - - - - - - $5,518
65,651
kWh
$684
90
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,461
Cost:
$650
- - - - - - $4,461 256 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,461
256
MMBtu
-
-
lb
-
-
Tgal
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,296
Cost:
$5,114
$1,741 20,809 $755 99 $(-200) (-89) - - - - - - $1,741
20,809
kWh
$755
99
kW-months/year
$(-200)
(-89)
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,179
Cost:
$2,000
$2,179 25,791 - - - - - - - - - - $2,179
25,791
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,837
Cost:
$800
$1,837 21,981 - - - - - - - - - - $1,837
21,981
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,273
Cost:
$1,632
$1,498 27,550 $(-225) (-34) - - - - - - - - $1,498
27,550
kWh
$(-225)
(-34)
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
Tgal
13: 2.2511 INSULATE BARE EQUIPMENT Savings:
$547
Cost:
$273
- - - - - - $547 188 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$547
188
MMBtu
-
-
lb
-
-
Tgal
14: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$15,270
Cost:
-
- - - - - - - - $15,270 300,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$15,270
300,000
lb
-
-
Tgal
15: 3.4151 MINIMIZE WATER USAGE Savings:
$229
Cost:
$100
- - - - - - - - - - $229 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
$229
-
Tgal
TOTAL RECOMMENDED Savings:
$113,775
Cost:
$149,216
$57,796 697,831 $5,592 731 $(-200) (-89) $35,088 13,833 $15,270 300,000 $229 - $57,796
697,831
kWh
$5,592
731
kW-months/year
$(-200)
(-89)
MMBtu
$35,088
13,833
MMBtu
$15,270
300,000
lb
$229
-
Tgal
TOTAL IMPLEMENTED Savings:
$70,822
Cost:
$104,072
$54,218 655,041 $4,837 632 - - $11,538 3,144 - - $229 - $54,218
655,041
kWh
$4,837
632
kW-months/year
-
-
MMBtu
$11,538
3,144
MMBtu
-
-
lb
$229
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb $ Tgal
Electricity Usage Electricity Demand Fuel Oil #2 Fuel Oil #6 Solid Waste (non-haz) Water Consumption Electricity Usage Electricity Demand Fuel Oil #2 Fuel Oil #6 Solid Waste (non-haz) Water Consumption