Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | Woolen goods |
NAICS | n/a |
SIC | 2231 - Broadwoven Fabric Mills, Wool |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 2,700,000 Pieces |
Production Hrs. Annual | 6,600 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $891,857 | 10,594,080 | kWh | $0.08 |
Electricity Demand | $236,066 | 31,061 | kW-months/year | $7.60 |
Electricity Fees | $47,911 | - | $ | - |
Fuel Oil #6 | $115,056 | 51,175 | MMBtu | $2.25 |
TOTAL ENERGY COSTS | $1,290,890 | |||
RECOMMENDED SAVINGS* | $113,775 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $70,822 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Fuel Oil #6 | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Fuel Oil #6 | Solid Waste (non-haz) | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $24,778 Cost: $56,288 |
$20,400 | 242,966 | $4,378 | 576 | - | - | - | - | - | - | - | - |
$20,400 242,966 kWh |
$4,378 576 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $16,324 Cost: $1,000 |
$16,324 | 194,314 | - | - | - | - | - | - | - | - | - | - |
$16,324 194,314 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS |
Savings: $12,357 Cost: $32,660 |
- | - | - | - | - | - | $12,357 | 5,714 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$12,357 5,714 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $11,193 Cost: $6,570 |
- | - | - | - | - | - | $11,193 | 4,975 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,193 4,975 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,299 Cost: $10,600 |
$8,299 | 98,769 | - | - | - | - | - | - | - | - | - | - |
$8,299 98,769 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS |
Savings: $6,530 Cost: $21,460 |
- | - | - | - | - | - | $6,530 | 2,700 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,530 2,700 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $6,202 Cost: $10,069 |
$5,518 | 65,651 | $684 | 90 | - | - | - | - | - | - | - | - |
$5,518 65,651 kWh |
$684 90 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,461 Cost: $650 |
- | - | - | - | - | - | $4,461 | 256 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$4,461 256 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $2,296 Cost: $5,114 |
$1,741 | 20,809 | $755 | 99 | $(-200) | (-89) | - | - | - | - | - | - |
$1,741 20,809 kWh |
$755 99 kW-months/year |
$(-200) (-89) MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $2,179 Cost: $2,000 |
$2,179 | 25,791 | - | - | - | - | - | - | - | - | - | - |
$2,179 25,791 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,837 Cost: $800 |
$1,837 | 21,981 | - | - | - | - | - | - | - | - | - | - |
$1,837 21,981 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,273 Cost: $1,632 |
$1,498 | 27,550 | $(-225) | (-34) | - | - | - | - | - | - | - | - |
$1,498 27,550 kWh |
$(-225) (-34) kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $547 Cost: $273 |
- | - | - | - | - | - | $547 | 188 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$547 188 MMBtu |
- - lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $15,270 Cost: - |
- | - | - | - | - | - | - | - | $15,270 | 300,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$15,270 300,000 lb |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 3.4151 MINIMIZE WATER USAGE |
Savings: $229 Cost: $100 |
- | - | - | - | - | - | - | - | - | - | $229 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
$229 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $113,775 Cost: $149,216 |
$57,796 | 697,831 | $5,592 | 731 | $(-200) | (-89) | $35,088 | 13,833 | $15,270 | 300,000 | $229 | - | $57,796 697,831 kWh |
$5,592 731 kW-months/year |
$(-200) (-89) MMBtu |
$35,088 13,833 MMBtu |
$15,270 300,000 lb |
$229 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $70,822 Cost: $104,072 |
$54,218 | 655,041 | $4,837 | 632 | - | - | $11,538 | 3,144 | - | - | $229 | - | $54,218 655,041 kWh |
$4,837 632 kW-months/year |
- - MMBtu |
$11,538 3,144 MMBtu |
- - lb |
$229 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Fuel Oil #6 | Solid Waste (non-haz) | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Fuel Oil #6 | Solid Waste (non-haz) | Water Consumption |