Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | pine boards |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $5,000,000-$10,000,000 |
# of Employees | 45 |
Plant Area (Sq.Ft.) | 59,000 |
Annual Production | 3,750,000 Thousand Feet |
Production Hrs. Annual | 2,312 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $201,261 | 3,037,515 | kWh | $0.07 |
Electricity Demand | $62,431 | 9,262 | kW-months/year | $6.74 |
Electricity Fees | $1,159 | - | $ | - |
Wood | $39,168 | 52,224 | MMBtu | $0.75 |
TOTAL ENERGY COSTS | $307,864 | |||
RECOMMENDED SAVINGS* | $49,707 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $34,276 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $27,060 Cost: $47,675 |
$27,060 | 410,023 | - | - | - | - | - | - | - | - | - | - |
$27,060 410,023 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,694 Cost: $11,058 |
$2,585 | 39,273 | $1,109 | 164 | - | - | - | - | - | - | - | - |
$2,585 39,273 kWh |
$1,109 164 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,248 Cost: $150 |
$1,248 | 18,757 | - | - | - | - | - | - | - | - | - | - |
$1,248 18,757 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $731 Cost: $1,580 |
$505 | 12,309 | $226 | 33 | - | - | - | - | - | - | - | - |
$505 12,309 kWh |
$226 33 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $366 Cost: $407 |
- | - | - | - | $366 | 207 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$366 207 MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $224 Cost: $100 |
$224 | 3,517 | - | - | - | - | - | - | - | - | - | - |
$224 3,517 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $8,700 Cost: $6,800 |
$(-300) | (-3,517) | - | - | - | - | - | - | - | - | $9,000 | - |
$(-300) (-3,517) kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
$9,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.3113 USE OTHER METHODS FOR NEUTRALIZATION |
Savings: $6,000 Cost: $7,800 |
- | - | - | - | - | - | - | - | $6,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
$6,000 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4155 METER WASTE WATER |
Savings: $1,684 Cost: $200 |
- | - | - | - | - | - | $1,684 | 1,981,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,684 1,981,500 gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,707 Cost: $75,770 |
$31,322 | 480,362 | $1,335 | 197 | $366 | 207 | $1,684 | 1,981,500 | $6,000 | - | $9,000 | - | $31,322 480,362 kWh |
$1,335 197 kW-months/year |
$366 207 MMBtu |
$1,684 1,981,500 gal |
$6,000 - $ |
$9,000 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $34,276 Cost: $59,590 |
$31,117 | 471,570 | $1,109 | 164 | $366 | 207 | $1,684 | 1,981,500 | - | - | - | - | $31,117 471,570 kWh |
$1,109 164 kW-months/year |
$366 207 MMBtu |
$1,684 1,981,500 gal |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Ancillary Material Cost | Water Consumption | Electricity Usage | Electricity Demand | Wood | Other Liquid (non-haz) | Ancillary Material Cost | Water Consumption |