Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | cassettes |
NAICS | n/a |
SIC | 3695 - Magnetic And Optical Recording Media |
Sales | $10,000,000-$50,000,000 |
# of Employees | 280 |
Plant Area (Sq.Ft.) | 105,000 |
Annual Production | 70,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $540,497 | 13,874,854 | kWh | $0.04 |
Electricity Demand | $192,453 | 31,430 | kW-months/year | $6.12 |
Electricity Fees | $(-80,622) | - | $ | - |
LPG | $2,210 | 145 | MMBtu | $15.24 |
Fuel Oil #2 | $12,809 | 2,789 | MMBtu | $4.59 |
TOTAL ENERGY COSTS | $667,347 | |||
RECOMMENDED SAVINGS* | $49,102 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,390 Cost: $39,936 |
$11,188 | 279,894 | $3,202 | 521 | - | - | - | - | - | - | - | - | - | - |
$11,188 279,894 kWh |
$3,202 521 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,953 Cost: $100 |
$5,953 | 148,886 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,953 148,886 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $5,910 Cost: $450 |
$5,910 | 147,714 | - | - | - | - | - | - | - | - | - | - | - | - |
$5,910 147,714 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $5,835 Cost: - |
- | - | - | - | - | - | - | - | - | - | $5,835 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$5,835 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,411 Cost: $2,247 |
$2,579 | 64,478 | $3,672 | 600 | $(-2,840) | (-275) | - | - | - | - | - | - | - | - |
$2,579 64,478 kWh |
$3,672 600 kW-months/year |
$(-2,840) (-275) MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $3,237 Cost: $9,562 |
- | - | - | - | - | - | $3,237 | 697 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,237 697 MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,859 Cost: $100 |
$2,859 | 71,512 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,859 71,512 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $2,680 Cost: $3,920 |
$2,680 | 67,116 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,680 67,116 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $2,522 Cost: $5,068 |
$2,085 | 52,462 | $437 | 71 | - | - | - | - | - | - | - | - | - | - |
$2,085 52,462 kWh |
$437 71 kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $1,892 Cost: - |
- | - | - | - | - | - | - | - | - | - | $1,892 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$1,892 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $163 Cost: - |
- | - | - | - | - | - | - | - | - | - | $163 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
$163 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $250 Cost: $100 |
- | - | - | - | - | - | - | - | $108 | 4,392 | - | - | $142 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
$108 4,392 Tgal |
- - $ |
$142 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $49,102 Cost: $61,483 |
$33,254 | 832,062 | $7,311 | 1,192 | $(-2,840) | (-275) | $3,237 | 697 | $108 | 4,392 | $7,890 | - | $142 | - | $33,254 832,062 kWh |
$7,311 1,192 kW-months/year |
$(-2,840) (-275) MMBtu |
$3,237 697 MMBtu |
$108 4,392 Tgal |
$7,890 - $ |
$142 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - Tgal |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | Tgal | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | Water Disposal | Administrative Changes | Water Consumption |