Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 1999 |
Principal Product | Cooked potato products |
NAICS | n/a |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 215 |
Plant Area (Sq.Ft.) | 66,000 |
Annual Production | 22,000,000 Pounds |
Production Hrs. Annual | 5,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $592,857 | 14,194,901 | kWh | $0.04 |
Electricity Demand | $217,356 | 34,832 | kW-months/year | $6.24 |
Electricity Fees | $67,728 | - | $ | - |
TOTAL ENERGY COSTS | $889,191 | |||
RECOMMENDED SAVINGS* | $1,321,824 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $51,981 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $1,257,001 Cost: $332,109 |
$74,250 | 1,650,352 | $28,080 | 4,500 | $(-55,329) | (-10,559) | - | - | - | - | $1,210,000 | - | - | - |
$74,250 1,650,352 kWh |
$28,080 4,500 kW-months/year |
$(-55,329) (-10,559) MMBtu |
- - lb |
- - $ |
$1,210,000 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $36,509 Cost: $13,360 |
$36,509 | 802,169 | - | - | - | - | - | - | - | - | - | - | - | - |
$36,509 802,169 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $12,800 Cost: - |
- | - | - | - | - | - | - | - | - | - | $12,800 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$12,800 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,824 Cost: $900 |
$2,824 | 62,720 | - | - | - | - | - | - | - | - | - | - | - | - |
$2,824 62,720 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $1,720 Cost: $6,216 |
$1,420 | 31,653 | $300 | 24 | - | - | - | - | - | - | - | - | - | - |
$1,420 31,653 kWh |
$300 24 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $493 Cost: $1,754 |
$(-296) | (-5,862) | $(-51) | (-9) | - | - | - | - | $(-36) | - | $876 | - | - | - |
$(-296) (-5,862) kWh |
$(-51) (-9) kW-months/year |
- - MMBtu |
- - lb |
$(-36) - $ |
$876 - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $201 Cost: $89 |
$161 | 3,517 | $40 | 6 | - | - | - | - | - | - | - | - | - | - |
$161 3,517 kWh |
$40 6 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $9,525 Cost: $10,000 |
- | - | - | - | - | - | $11,250 | 375,000 | $1,275 | - | $(-3,000) | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$11,250 375,000 lb |
$1,275 - $ |
$(-3,000) - $ |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.4151 MINIMIZE WATER USAGE |
Savings: $751 Cost: $1,345 |
- | - | - | - | - | - | - | - | - | - | - | - | $751 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
$751 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,321,824 Cost: $365,773 |
$114,868 | 2,544,549 | $28,369 | 4,521 | $(-55,329) | (-10,559) | $11,250 | 375,000 | $1,239 | - | $1,220,676 | - | $751 | - | $114,868 2,544,549 kWh |
$28,369 4,521 kW-months/year |
$(-55,329) (-10,559) MMBtu |
$11,250 375,000 lb |
$1,239 - $ |
$1,220,676 - $ |
$751 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $51,981 Cost: $21,010 |
$38,090 | 837,339 | $340 | 30 | - | - | - | - | - | - | $12,800 | - | $751 | - | $38,090 837,339 kWh |
$340 30 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$12,800 - $ |
$751 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption | Electricity Usage | Electricity Demand | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Water Consumption |