IAC logo
IAC Assessment: ME0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Athletic Shoes
NAICS n/a
SIC 3144 - Women's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 375
Plant Area (Sq.Ft.) 127,785
Annual Production 1,600,000 Pieces
Production Hrs. Annual 2,500
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $130,872 2,181,712 kWh $0.06
Electricity Demand $94,755 7,455 kW-months/year $12.71
Fuel Oil #2 $18,592 5,880 MMBtu $3.16
TOTAL ENERGY COSTS $247,969
RECOMMENDED SAVINGS* $100,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,298
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $
01: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$46,375
Cost:
-
- - - - - - - - - - $46,375 775,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$46,375
775,000
lb
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$30,810
Cost:
-
- - - - $30,810 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$30,810
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,566
Cost:
$16,265
$9,431 160,023 - - - - - - $(-1,865) (-579) - - - - $9,431
160,023
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-1,865)
(-579)
MMBtu
-
-
lb
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$1,006
Cost:
$1,750
$3,216 54,513 - - - - $(-2,210) (-233) - - - - - - $3,216
54,513
kWh
-
-
kW-months/year
-
-
$
$(-2,210)
(-233)
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$3,750
Cost:
$850
- - - - - - - - - - - - $3,750 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
$3,750
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,736
Cost:
$80
$3,736 62,427 - - - - - - - - - - - - $3,736
62,427
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,865
Cost:
$3,563
$1,569 26,084 $1,296 102 - - - - - - - - - - $1,569
26,084
kWh
$1,296
102
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,558
Cost:
$1,844
- - - - - - - - $2,558 556 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,558
556
MMBtu
-
-
lb
-
-
$
09: 3.2176 INCREASE USE OF AUTOMATION Savings:
$1,851
Cost:
$2,515
$1,851 31,360 - - - - - - - - - - - - $1,851
31,360
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$100,517
Cost:
$26,867
$19,803 334,407 $1,296 102 $30,810 - $(-2,210) (-233) $693 (-23) $46,375 775,000 $3,750 - $19,803
334,407
kWh
$1,296
102
kW-months/year
$30,810
-
$
$(-2,210)
(-233)
MMBtu
$693
(-23)
MMBtu
$46,375
775,000
lb
$3,750
-
$
TOTAL IMPLEMENTED Savings:
$65,298
Cost:
$22,508
$17,952 303,047 $1,296 102 - - $(-2,210) (-233) $(-1,865) (-579) $46,375 775,000 $3,750 - $17,952
303,047
kWh
$1,296
102
kW-months/year
-
-
$
$(-2,210)
(-233)
MMBtu
$(-1,865)
(-579)
MMBtu
$46,375
775,000
lb
$3,750
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #2 Solid Waste (non-haz) Personnel Changes