Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Athletic Shoes |
NAICS | n/a |
SIC | 3144 - Women's Footwear, Except Athletic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 325 |
Plant Area (Sq.Ft.) | 120,300 |
Annual Production | 864,000 Pieces |
Production Hrs. Annual | 4,120 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $102,780 | 1,668,816 | kWh | $0.06 |
Electricity Demand | $67,549 | 5,987 | kW-months/year | $11.28 |
Electricity Fees | $1,117 | - | $ | - |
Fuel Oil #2 | $17,241 | 4,862 | MMBtu | $3.55 |
TOTAL ENERGY COSTS | $192,437 | |||
RECOMMENDED SAVINGS* | $96,286 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,671 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $16,377 Cost: - |
- | - | - | - | $16,377 | - | - | - | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$16,377 - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $6,781 Cost: $15,835 |
$8,836 | 144,490 | - | 421 | - | - | - | - | $(-2,055) | (-581) | - | - | - | - |
$8,836 144,490 kWh |
- 421 kW-months/year |
- - $ |
- - MMBtu |
$(-2,055) (-581) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,432 Cost: $590 |
$6,432 | 107,268 | - | - | - | - | - | - | - | - | - | - | - | - |
$6,432 107,268 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,482 Cost: $14,072 |
$3,046 | 50,703 | $2,436 | 215 | - | - | - | - | - | - | - | - | - | - |
$3,046 50,703 kWh |
$2,436 215 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $4,832 Cost: $9,423 |
$4,832 | 300,117 | - | - | - | - | - | - | - | - | - | - | - | - |
$4,832 300,117 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.5196 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS |
Savings: $3,459 Cost: $10,000 |
$2,393 | 39,859 | $1,066 | 94 | - | - | - | - | - | - | - | - | - | - |
$2,393 39,859 kWh |
$1,066 94 kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,023 Cost: $3,500 |
$7,928 | 132,181 | - | 378 | - | - | $(-4,905) | (-564) | - | - | - | - | - | - |
$7,928 132,181 kWh |
- 378 kW-months/year |
- - $ |
$(-4,905) (-564) MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,525 Cost: $2,000 |
$1,525 | 24,912 | - | - | - | - | - | - | - | - | - | - | - | - |
$1,525 24,912 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS |
Savings: $46,375 Cost: - |
- | - | - | - | - | - | - | - | - | - | $46,375 | 775,000 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
$46,375 775,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $2,000 Cost: $3,500 |
- | - | - | - | - | - | - | - | - | - | - | - | $2,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - MMBtu |
- - lb |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $96,286 Cost: $58,920 |
$34,992 | 799,530 | $3,502 | 1,108 | $16,377 | - | $(-4,905) | (-564) | $(-2,055) | (-581) | $46,375 | 775,000 | $2,000 | - | $34,992 799,530 kWh |
$3,502 1,108 kW-months/year |
$16,377 - $ |
$(-4,905) (-564) MMBtu |
$(-2,055) (-581) MMBtu |
$46,375 775,000 lb |
$2,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,671 Cost: $29,585 |
$23,763 | 615,181 | $2,436 | 593 | $16,377 | - | $(-4,905) | (-564) | - | - | - | - | - | - | $23,763 615,181 kWh |
$2,436 593 kW-months/year |
$16,377 - $ |
$(-4,905) (-564) MMBtu |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Electricity Fees | LPG | Fuel Oil #2 | Solid Waste (non-haz) | Personnel Changes |