Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Maine |
---|---|
Assessment Year | 2000 |
Principal Product | Hardwood lumber |
NAICS | n/a |
SIC | 2421 - Sawmills And Planing Mills, General |
Sales | $1,000,000-$5,000,000 |
# of Employees | 32 |
Plant Area (Sq.Ft.) | 25,500 |
Annual Production | 6,700,000 Thousand Feet |
Production Hrs. Annual | 2,350 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $78,058 | 843,200 | kWh | $0.09 |
Electricity Demand | $31,330 | 5,207 | kW-months/year | $6.02 |
LPG | $12,751 | 1,337 | MMBtu | $9.54 |
Fuel Oil #2 | $972 | 245 | MMBtu | $3.97 |
TOTAL ENERGY COSTS | $123,111 | |||
RECOMMENDED SAVINGS* | $44,170 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $6,816 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | By-product Production | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,702 Cost: $60 |
$4,702 | 52,169 | - | - | - | - | - | - | - | - |
$4,702 52,169 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,538 Cost: $3,943 |
$3,222 | 35,756 | $316 | 54 | - | - | - | - | - | - |
$3,222 35,756 kWh |
$316 54 kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,294 Cost: $4,112 |
- | - | - | - | - | - | $3,294 | 536 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,294 536 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,828 Cost: $160 |
$2,828 | 31,360 | - | - | - | - | - | - | - | - |
$2,828 31,360 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $790 Cost: $750 |
$1,071 | 11,723 | $97 | 16 | $(-378) | (-40) | - | - | - | - |
$1,071 11,723 kWh |
$97 16 kW-months/year |
$(-378) (-40) MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $694 Cost: $160 |
$694 | 7,620 | - | - | - | - | - | - | - | - |
$694 7,620 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $67 Cost: $100 |
$67 | 879 | - | - | - | - | - | - | - | - |
$67 879 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT |
Savings: $28,257 Cost: $53,000 |
$(-3,120) | (-24,033) | $(-217) | (-36) | $35,039 | 3,520 | - | - | $(-3,445) | - |
$(-3,120) (-24,033) kWh |
$(-217) (-36) kW-months/year |
$35,039 3,520 MMBtu |
- - MMBtu |
$(-3,445) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $44,170 Cost: $62,285 |
$9,464 | 115,474 | $196 | 34 | $34,661 | 3,480 | $3,294 | 536 | $(-3,445) | - | $9,464 115,474 kWh |
$196 34 kW-months/year |
$34,661 3,480 MMBtu |
$3,294 536 MMBtu |
$(-3,445) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $6,816 Cost: $4,432 |
$3,522 | 38,980 | - | - | - | - | $3,294 | 536 | - | - | $3,522 38,980 kWh |
- - kW-months/year |
- - MMBtu |
$3,294 536 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | By-product Production | Electricity Usage | Electricity Demand | LPG | Fuel Oil #2 | By-product Production |