IAC logo
IAC Assessment: ME0291
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0291
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Hardwood lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $1,000,000-$5,000,000
# of Employees 32
Plant Area (Sq.Ft.) 25,500
Annual Production 6,700,000 Thousand Feet
Production Hrs. Annual 2,350
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,058 843,200 kWh $0.09
Electricity Demand $31,330 5,207 kW-months/year $6.02
LPG $12,751 1,337 MMBtu $9.54
Fuel Oil #2 $972 245 MMBtu $3.97
TOTAL ENERGY COSTS $123,111
RECOMMENDED SAVINGS* $44,170 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,816
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 By-product Production Electricity Usage Electricity Demand LPG Fuel Oil #2 By-product Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,702
Cost:
$60
$4,702 52,169 - - - - - - - - $4,702
52,169
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,538
Cost:
$3,943
$3,222 35,756 $316 54 - - - - - - $3,222
35,756
kWh
$316
54
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,294
Cost:
$4,112
- - - - - - $3,294 536 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,294
536
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,828
Cost:
$160
$2,828 31,360 - - - - - - - - $2,828
31,360
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$790
Cost:
$750
$1,071 11,723 $97 16 $(-378) (-40) - - - - $1,071
11,723
kWh
$97
16
kW-months/year
$(-378)
(-40)
MMBtu
-
-
MMBtu
-
-
$
06: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$694
Cost:
$160
$694 7,620 - - - - - - - - $694
7,620
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$67
Cost:
$100
$67 879 - - - - - - - - $67
879
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$28,257
Cost:
$53,000
$(-3,120) (-24,033) $(-217) (-36) $35,039 3,520 - - $(-3,445) - $(-3,120)
(-24,033)
kWh
$(-217)
(-36)
kW-months/year
$35,039
3,520
MMBtu
-
-
MMBtu
$(-3,445)
-
$
TOTAL RECOMMENDED Savings:
$44,170
Cost:
$62,285
$9,464 115,474 $196 34 $34,661 3,480 $3,294 536 $(-3,445) - $9,464
115,474
kWh
$196
34
kW-months/year
$34,661
3,480
MMBtu
$3,294
536
MMBtu
$(-3,445)
-
$
TOTAL IMPLEMENTED Savings:
$6,816
Cost:
$4,432
$3,522 38,980 - - - - $3,294 536 - - $3,522
38,980
kWh
-
-
kW-months/year
-
-
MMBtu
$3,294
536
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand LPG Fuel Oil #2 By-product Production Electricity Usage Electricity Demand LPG Fuel Oil #2 By-product Production