IAC logo
IAC Assessment: ME0294
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0294
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 2000
Principal Product Small composite parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 120,000
Annual Production 24,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $306,979 3,431,125 kWh $0.09
Electricity Demand $77,508 10,110 kW-months/year $7.67
Electricity Fees $3,228 - $ -
LPG $33,014 5,054 MMBtu $6.53
Fuel Oil #4 $56,157 11,924 MMBtu $4.71
TOTAL ENERGY COSTS $486,482
RECOMMENDED SAVINGS* $127,700 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #4 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Increase in Production Electricity Usage Electricity Demand LPG Fuel Oil #4 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Increase in Production
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal $ %
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$17,247
Cost:
$27,038
$18,075 201,934 $3,037 396 - - $(-3,865) (-821) - - - - - - - - - - - - $18,075
201,934
kWh
$3,037
396
kW-months/year
-
-
MMBtu
$(-3,865)
(-821)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$16,038
Cost:
$1,900
$16,038 179,367 - - - - - - - - - - - - - - - - - - $16,038
179,367
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$14,114
Cost:
$12,500
$14,789 165,299 $2,485 324 - - $(-3,160) (-671) - - - - - - - - - - - - $14,789
165,299
kWh
$2,485
324
kW-months/year
-
-
MMBtu
$(-3,160)
(-671)
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
04: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$8,247
Cost:
-
- - $8,247 - - - - - - - - - - - - - - - - - -
-
kWh
$8,247
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,416
Cost:
$1,100
$7,416 82,943 - - - - - - - - - - - - - - - - - - $7,416
82,943
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,511
Cost:
$15,579
$5,464 60,961 $1,047 137 - - - - - - - - - - - - - - - - $5,464
60,961
kWh
$1,047
137
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
07: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,742
Cost:
$2,145
$3,629 40,445 $1,243 162 $(-1,130) (-173) - - - - - - - - - - - - - - $3,629
40,445
kWh
$1,243
162
kW-months/year
$(-1,130)
(-173)
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$2,388
Cost:
$1,000
- - - - - - $2,388 380 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,388
380
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,982
Cost:
$1,357
$1,982 22,274 - - - - - - - - - - - - - - - - - - $1,982
22,274
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$708
Cost:
$756
- - - - - - $708 120 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$708
120
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
11: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,680
Cost:
$9,000
- - - - - - - - - - $9,680 121,000 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
$9,680
121,000
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
12: 3.4151 MINIMIZE WATER USAGE Savings:
$260
Cost:
$34
$153 1,758 - - - - - - $51 12,750 - - - - - - $56 - - - $153
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$51
12,750
Tgal
-
-
lb
-
-
$
-
-
$
$56
-
Tgal
-
-
%
13: 4.125 Savings:
$33,752
Cost:
$49,220
- - - - - - - - - - - - $7,752 - - - - - $26,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
$7,752
-
$
-
-
$
-
-
Tgal
$26,000
-
%
14: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$5,615
Cost:
-
- - - - - - - - - - - - - - $5,615 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
$5,615
-
$
-
-
Tgal
-
-
%
TOTAL RECOMMENDED Savings:
$127,700
Cost:
$121,629
$67,546 754,981 $16,059 1,019 $(-1,130) (-173) $(-3,929) (-992) $51 12,750 $9,680 121,000 $7,752 - $5,615 - $56 - $26,000 - $67,546
754,981
kWh
$16,059
1,019
kW-months/year
$(-1,130)
(-173)
MMBtu
$(-3,929)
(-992)
MMBtu
$51
12,750
Tgal
$9,680
121,000
lb
$7,752
-
$
$5,615
-
$
$56
-
Tgal
$26,000
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
Tgal
-
-
lb
-
-
$
-
-
$
-
-
Tgal
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ Tgal $ lb $ $ $ $ $ Tgal $ %
Electricity Usage Electricity Demand LPG Fuel Oil #4 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Increase in Production Electricity Usage Electricity Demand LPG Fuel Oil #4 Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Water Consumption Increase in Production