IAC logo
IAC Assessment: MI0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2001
Principal Product Compact Discs
NAICS n/a
SIC 3652 - Prerecorded Records And Tapes
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 75,000
Annual Production 37,440,000 Pieces
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $471,171 8,980,219 kWh $0.05
Electricity Demand $116,205 12,995 kW-months/year $8.94
TOTAL ENERGY COSTS $587,376
RECOMMENDED SAVINGS* $405,469 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$279,552
Cost:
$120
- - - - $279,552 - -
-
kWh
-
-
kW-months/year
$279,552
-
$
02: 2.5194 REDESIGN PROCESS Savings:
$24,074
Cost:
$13,312
$24,074 454,222 - - - - $24,074
454,222
kWh
-
-
kW-months/year
-
-
$
03: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$14,899
Cost:
$139
- - $14,899 149 - - -
-
kWh
$14,899
149
kW-months/year
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$48,965
Cost:
$16
$48,965 923,870 - - - - $48,965
923,870
kWh
-
-
kW-months/year
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$21,743
Cost:
$16
$21,743 410,243 - - - - $21,743
410,243
kWh
-
-
kW-months/year
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,932
Cost:
$256
$4,763 89,856 $1,169 144 - - $4,763
89,856
kWh
$1,169
144
kW-months/year
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,304
Cost:
$256
$9,524 179,712 $780 96 - - $9,524
179,712
kWh
$780
96
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$405,469
Cost:
$14,115
$109,069 2,057,903 $16,848 389 $279,552 - $109,069
2,057,903
kWh
$16,848
389
kW-months/year
$279,552
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product