Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2010 |
Principal Product | toilet tissue |
NAICS | 322121 - Paper (except Newsprint) Mills |
SIC | 2621 - Paper Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 20,000 Tons |
Production Hrs. Annual | 8,568 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,782,797 | 39,116,945 | kWh | $0.07 |
Electricity Demand | $281,484 | 70,313 | kW-months/year | $4.00 |
Electricity Fees | $390,029 | - | $ | - |
Natural Gas | $1,132,450 | 187,045 | MMBtu | $6.05 |
TOTAL ENERGY COSTS | $4,586,760 | |||
RECOMMENDED SAVINGS* | $700,361 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $606,228 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME |
Savings: $500,499 Cost: - |
- | - | - | - | - | - | $500,499 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$500,499 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $45,276 Cost: $2,000 |
- | - | $45,276 | 8,400 | - | - | - | - |
- - kWh |
$45,276 8,400 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $42,782 Cost: $60 |
$38,181 | 477,264 | $4,601 | 1,151 | - | - | - | - |
$38,181 477,264 kWh |
$4,601 1,151 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $38,905 Cost: - |
- | - | - | - | $38,905 | 6,484 | - | - |
- - kWh |
- - kW-months/year |
$38,905 6,484 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $29,420 Cost: $920 |
$26,458 | 330,730 | $2,962 | 740 | - | - | - | - |
$26,458 330,730 kWh |
$2,962 740 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $26,600 Cost: $1,920 |
- | - | $26,600 | 2,400 | - | - | - | - |
- - kWh |
$26,600 2,400 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,952 Cost: $3,680 |
$9,301 | 116,268 | $651 | 163 | - | - | - | - |
$9,301 116,268 kWh |
$651 163 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,050 Cost: $2,904 |
- | - | - | - | $3,050 | 504 | - | - |
- - kWh |
- - kW-months/year |
$3,050 504 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,341 Cost: $1,800 |
- | - | - | - | $2,341 | 387 | - | - |
- - kWh |
- - kW-months/year |
$2,341 387 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,536 Cost: $1,500 |
- | - | - | - | $1,536 | 258 | - | - |
- - kWh |
- - kW-months/year |
$1,536 258 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $700,361 Cost: $14,784 |
$73,940 | 924,262 | $80,090 | 12,854 | $45,832 | 7,633 | $500,499 | - | $73,940 924,262 kWh |
$80,090 12,854 kW-months/year |
$45,832 7,633 MMBtu |
$500,499 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $606,228 Cost: $9,104 |
$64,639 | 807,994 | $34,163 | 4,291 | $6,927 | 1,149 | $500,499 | - | $64,639 807,994 kWh |
$34,163 4,291 kW-months/year |
$6,927 1,149 MMBtu |
$500,499 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |