IAC Assessment: MI0188
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0188
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2010
Principal Product toilet tissue
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 240,000
Annual Production 20,000 Tons
Production Hrs. Annual 8,568
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,782,797 39,116,945 kWh $0.07
Electricity Demand $281,484 70,313 kW-months/year $4.00
Electricity Fees $390,029 - $ -
Natural Gas $1,132,450 187,045 MMBtu $6.05
TOTAL ENERGY COSTS $4,586,760
RECOMMENDED SAVINGS* $700,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $606,228
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 3.6112 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME Savings:
$500,499
Cost:
-
- - - - - - $500,499 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$500,499
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$45,276
Cost:
$2,000
- - $45,276 8,400 - - - - -
-
kWh
$45,276
8,400
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$42,782
Cost:
$60
$38,181 477,264 $4,601 1,151 - - - - $38,181
477,264
kWh
$4,601
1,151
kW-months/year
-
-
MMBtu
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$38,905
Cost:
-
- - - - $38,905 6,484 - - -
-
kWh
-
-
kW-months/year
$38,905
6,484
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,420
Cost:
$920
$26,458 330,730 $2,962 740 - - - - $26,458
330,730
kWh
$2,962
740
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,600
Cost:
$1,920
- - $26,600 2,400 - - - - -
-
kWh
$26,600
2,400
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,952
Cost:
$3,680
$9,301 116,268 $651 163 - - - - $9,301
116,268
kWh
$651
163
kW-months/year
-
-
MMBtu
-
-
$
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$3,050
Cost:
$2,904
- - - - $3,050 504 - - -
-
kWh
-
-
kW-months/year
$3,050
504
MMBtu
-
-
$
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,341
Cost:
$1,800
- - - - $2,341 387 - - -
-
kWh
-
-
kW-months/year
$2,341
387
MMBtu
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,536
Cost:
$1,500
- - - - $1,536 258 - - -
-
kWh
-
-
kW-months/year
$1,536
258
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$700,361
Cost:
$14,784
$73,940 924,262 $80,090 12,854 $45,832 7,633 $500,499 - $73,940
924,262
kWh
$80,090
12,854
kW-months/year
$45,832
7,633
MMBtu
$500,499
-
$
TOTAL IMPLEMENTED Savings:
$606,228
Cost:
$9,104
$64,639 807,994 $34,163 4,291 $6,927 1,149 $500,499 - $64,639
807,994
kWh
$34,163
4,291
kW-months/year
$6,927
1,149
MMBtu
$500,499
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes