IAC logo
IAC Assessment: MI0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Electronic Circuits
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 231
Plant Area (Sq.Ft.) 100,000
Annual Production 300,000 Pieces
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $284,264 4,337,539 kWh $0.07
Electricity Demand $119,485 11,578 kW-months/year $10.32
Electricity Fees $11,602 - $ -
TOTAL ENERGY COSTS $415,351
RECOMMENDED SAVINGS* $126,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,920
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$30,611
Cost:
$1,800
$20,590 328,130 $10,021 971 $20,590
328,130
kWh
$10,021
971
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$26,976
Cost:
$407
$15,065 240,084 $11,911 1,154 $15,065
240,084
kWh
$11,911
1,154
kW-months/year
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$24,698
Cost:
$160
$18,536 279,448 $6,162 597 $18,536
279,448
kWh
$6,162
597
kW-months/year
04: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$13,325
Cost:
$13,200
$7,226 115,149 $6,099 591 $7,226
115,149
kWh
$6,099
591
kW-months/year
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$12,407
Cost:
$1,680
$6,731 107,262 $5,676 550 $6,731
107,262
kWh
$5,676
550
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,737
Cost:
$1,660
$2,624 41,824 $1,113 108 $2,624
41,824
kWh
$1,113
108
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,337
Cost:
$80
$2,036 32,452 $1,301 126 $2,036
32,452
kWh
$1,301
126
kW-months/year
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,960
Cost:
$7,502
$1,659 24,579 $1,301 126 $1,659
24,579
kWh
$1,301
126
kW-months/year
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,930
Cost:
$896
$1,590 25,326 $1,340 130 $1,590
25,326
kWh
$1,340
130
kW-months/year
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,980
Cost:
$440
$1,072 17,082 $908 88 $1,072
17,082
kWh
$908
88
kW-months/year
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,631
Cost:
$3,190
$1,092 17,400 $539 52 $1,092
17,400
kWh
$539
52
kW-months/year
12: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,214
Cost:
$1,694
$657 10,474 $557 54 $657
10,474
kWh
$557
54
kW-months/year
13: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$684
Cost:
$2,000
$396 6,318 $288 22 $396
6,318
kWh
$288
22
kW-months/year
TOTAL RECOMMENDED Savings:
$126,490
Cost:
$34,709
$79,274 1,245,528 $47,216 4,569 $79,274
1,245,528
kWh
$47,216
4,569
kW-months/year
TOTAL IMPLEMENTED Savings:
$93,920
Cost:
$30,966
$61,151 956,718 $32,769 3,175 $61,151
956,718
kWh
$32,769
3,175
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand