IAC logo
IAC Assessment: MI0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 65
Plant Area (Sq.Ft.) 500,000
Annual Production 200,000 Tons
Production Hrs. Annual 2,964
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,365 912,720 kWh $0.05
Electricity Demand $46,994 4,693 kW-months/year $10.01
Electricity Fees $15,352 - $ -
Natural Gas $670,266 170,724 MMBtu $3.93
Fuel Oil #2 $3,600,000 126,895 MMBtu $28.37
TOTAL ENERGY COSTS $4,380,978
RECOMMENDED SAVINGS* $1,921,158 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,874,270
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$1,845,922
Cost:
$2,000,000
- - - - - - $1,845,922 65,066 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,845,922
65,066
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$38,483
Cost:
$20,790
- - - - $38,483 9,718 - - -
-
kWh
-
-
kW-months/year
$38,483
9,718
MMBtu
-
-
MMBtu
03: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$14,224
Cost:
$11,600
- - - - - - $14,224 501 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,224
501
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,076
Cost:
$13,090
$5,283 99,674 $2,793 278 - - - - $5,283
99,674
kWh
$2,793
278
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,223
Cost:
$2,520
- - - - $5,223 1,319 - - -
-
kWh
-
-
kW-months/year
$5,223
1,319
MMBtu
-
-
MMBtu
06: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$2,451
Cost:
$347
$1,387 26,167 $1,064 106 - - - - $1,387
26,167
kWh
$1,064
106
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,546
Cost:
$1,660
$1,167 22,024 $2,379 237 - - - - $1,167
22,024
kWh
$2,379
237
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,904
Cost:
$80
$1,756 33,140 $1,148 114 - - - - $1,756
33,140
kWh
$1,148
114
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$329
Cost:
$1,104
- - - - $329 83 - - -
-
kWh
-
-
kW-months/year
$329
83
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$1,921,158
Cost:
$2,051,191
$9,593 181,005 $7,384 735 $44,035 11,120 $1,860,146 65,567 $9,593
181,005
kWh
$7,384
735
kW-months/year
$44,035
11,120
MMBtu
$1,860,146
65,567
MMBtu
TOTAL IMPLEMENTED Savings:
$1,874,270
Cost:
$2,016,207
$4,310 81,331 $4,591 457 $5,223 1,319 $1,860,146 65,567 $4,310
81,331
kWh
$4,591
457
kW-months/year
$5,223
1,319
MMBtu
$1,860,146
65,567
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2