IAC logo
IAC Assessment: MI0280
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0280
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2015
Principal Product Test Strips
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 75,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,899 5,049,154 kWh $0.05
Electricity Demand $116,129 10,024 kW-months/year $11.59
Electricity Fees $65,206 - $ -
TOTAL ENERGY COSTS $424,234
RECOMMENDED SAVINGS* $28,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,965
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,699
Cost:
$1,400
$5,034 104,872 $2,665 230 - - $5,034
104,872
kWh
$2,665
230
kW-months/year
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,149
Cost:
$2,100
- - - - $7,149 - -
-
kWh
-
-
kW-months/year
$7,149
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,428
Cost:
$1,660
$4,829 100,597 $1,599 138 - - $4,829
100,597
kWh
$1,599
138
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,213
Cost:
$40
$2,414 50,300 $799 69 - - $2,414
50,300
kWh
$799
69
kW-months/year
-
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,213
Cost:
$4,750
$912 19,003 $301 26 - - $912
19,003
kWh
$301
26
kW-months/year
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,053
Cost:
$332
$1,053 21,945 - - - - $1,053
21,945
kWh
-
-
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$797
Cost:
$3,520
$797 16,600 - - - - $797
16,600
kWh
-
-
kW-months/year
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$393
Cost:
$220
$295 6,128 $98 8 - - $295
6,128
kWh
$98
8
kW-months/year
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$233
Cost:
$375
$175 3,646 $58 5 - - $175
3,646
kWh
$58
5
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$28,178
Cost:
$14,397
$15,509 323,091 $5,520 476 $7,149 - $15,509
323,091
kWh
$5,520
476
kW-months/year
$7,149
-
$
TOTAL IMPLEMENTED Savings:
$24,965
Cost:
$14,357
$13,095 272,791 $4,721 407 $7,149 - $13,095
272,791
kWh
$4,721
407
kW-months/year
$7,149
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees