IAC Assessment: MI0283
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0283
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2015
Principal Product Printed Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3672 - Printed Circuit Boards
Sales $50,000,000-$100,000,000
# of Employees 462
Plant Area (Sq.Ft.) 67,000
Annual Production 300,000 Units
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $493,327 7,462,700 kWh $0.07
Electricity Demand $165,203 16,360 kW-months/year $10.10
Electricity Fees $104,312 - $ -
TOTAL ENERGY COSTS $762,842
RECOMMENDED SAVINGS* $178,250 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,562
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$75,489
Cost:
$140,000
$46,020 696,219 $11,269 1,116 $18,200 - $46,020
696,219
kWh
$11,269
1,116
kW-months/year
$18,200
-
$
02: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$54,079
Cost:
$166,590
$43,446 657,270 $10,633 1,053 - - $43,446
657,270
kWh
$10,633
1,053
kW-months/year
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$20,030
Cost:
$160
$16,091 243,433 $3,939 390 - - $16,091
243,433
kWh
$3,939
390
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,361
Cost:
$1,660
$13,502 204,260 $4,859 481 - - $13,502
204,260
kWh
$4,859
481
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,483
Cost:
$9,820
$5,483 83,089 - - - - $5,483
83,089
kWh
-
-
kW-months/year
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,494
Cost:
$1,400
$1,999 30,287 $495 49 - - $1,999
30,287
kWh
$495
49
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$942
Cost:
$40
$619 9,372 $323 32 - - $619
9,372
kWh
$323
32
kW-months/year
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$688
Cost:
$639
$553 8,369 $135 13 - - $553
8,369
kWh
$135
13
kW-months/year
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$684
Cost:
$177
$684 10,356 - - - - $684
10,356
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$178,250
Cost:
$320,486
$128,397 1,942,655 $31,653 3,134 $18,200 - $128,397
1,942,655
kWh
$31,653
3,134
kW-months/year
$18,200
-
$
TOTAL IMPLEMENTED Savings:
$44,562
Cost:
$12,279
$35,629 539,151 $8,933 884 - - $35,629
539,151
kWh
$8,933
884
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees