Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2017 |
Principal Product | Surgical Scapels |
NAICS | 339112 - Surgical and Medical Instrument Manufacturing |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 220 |
Plant Area (Sq.Ft.) | 84,000 |
Annual Production | 100,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | PR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,037,108 | 6,931,663 | kWh | $0.15 |
Electricity Demand | $105,505 | 12,993 | kW-months/year | $8.12 |
Fuel Oil #6 | $48,000 | 3,600 | MMBtu | $13.33 |
TOTAL ENERGY COSTS | $1,190,613 | |||
RECOMMENDED SAVINGS* | $164,734 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $130,208 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Electricity Usage | Electricity Demand | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $60,269 Cost: $1,660 |
$57,776 | 385,170 | $2,493 | 307 | - | - |
$57,776 385,170 kWh |
$2,493 307 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1224 REPLACE BOILER |
Savings: $28,850 Cost: $36,000 |
- | - | - | - | $28,850 | 2,164 |
- - kWh |
- - kW-months/year |
$28,850 2,164 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $23,532 Cost: $1,560 |
$17,763 | 118,420 | $5,769 | 710 | - | - |
$17,763 118,420 kWh |
$5,769 710 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $18,687 Cost: $960 |
$17,323 | 115,488 | $1,364 | 168 | - | - |
$17,323 115,488 kWh |
$1,364 168 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2515 USE OPTIMUM THICKNESS INSULATION |
Savings: $10,994 Cost: $1,320 |
$10,192 | 67,945 | $802 | 99 | - | - |
$10,192 67,945 kWh |
$802 99 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $9,833 Cost: $434 |
$9,833 | 65,555 | - | - | - | - |
$9,833 65,555 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $6,476 Cost: $6,800 |
$6,005 | 40,036 | $471 | 58 | - | - |
$6,005 40,036 kWh |
$471 58 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,093 Cost: $5,340 |
$6,093 | 40,623 | - | - | - | - |
$6,093 40,623 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $164,734 Cost: $54,074 |
$124,985 | 833,237 | $10,899 | 1,342 | $28,850 | 2,164 | $124,985 833,237 kWh |
$10,899 1,342 kW-months/year |
$28,850 2,164 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $130,208 Cost: $51,194 |
$97,030 | 646,872 | $4,328 | 533 | $28,850 | 2,164 | $97,030 646,872 kWh |
$4,328 533 kW-months/year |
$28,850 2,164 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Electricity Usage | Electricity Demand | Fuel Oil #6 |