IAC logo
IAC Assessment: MI0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2017
Principal Product treated water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 13,000,000
Annual Production 100,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,716,458 141,744,000 kWh $0.04
Electricity Demand $2,908,255 533,253 kW-months/year $5.45
Electricity Fees $628,471 - $ -
TOTAL ENERGY COSTS $9,253,184
RECOMMENDED SAVINGS* $2,239,259 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,174,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1336 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL Savings:
$1,663,200
Cost:
$4,120,000
$1,401,600 35,040,000 $261,600 48,000 $(0) (-120,450) - - $1,401,600
35,040,000
kWh
$261,600
48,000
kW-months/year
$(0)
(-120,450)
MMBtu
-
-
$
02: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS Savings:
$314,391
Cost:
$1,004,370
$264,941 6,623,524 $49,450 9,073 - - - - $264,941
6,623,524
kWh
$49,450
9,073
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$171,697
Cost:
$338,000
$127,826 3,195,648 $23,871 4,380 - - $20,000 - $127,826
3,195,648
kWh
$23,871
4,380
kW-months/year
-
-
MMBtu
$20,000
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$32,930
Cost:
$6,000
$27,752 693,792 $5,178 950 - - - - $27,752
693,792
kWh
$5,178
950
kW-months/year
-
-
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$31,753
Cost:
$112,000
$9,102 227,550 $22,651 4,156 - - - - $9,102
227,550
kWh
$22,651
4,156
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,288
Cost:
$72,396
$18,414 460,338 $6,874 1,261 - - - - $18,414
460,338
kWh
$6,874
1,261
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$2,239,259
Cost:
$5,652,766
$1,849,635 46,240,852 $369,624 67,820 $(0) (-120,450) $20,000 - $1,849,635
46,240,852
kWh
$369,624
67,820
kW-months/year
$(0)
(-120,450)
MMBtu
$20,000
-
$
TOTAL IMPLEMENTED Savings:
$2,174,576
Cost:
$5,534,766
$1,812,781 45,319,510 $341,795 62,714 $(0) (-120,450) $20,000 - $1,812,781
45,319,510
kWh
$341,795
62,714
kW-months/year
$(0)
(-120,450)
MMBtu
$20,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Other Gas Administrative Changes Electricity Usage Electricity Demand Other Gas Administrative Changes