IAC logo
IAC Assessment: MI0337
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0337
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Surgical Medical Devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 220,000
Annual Production 250,000 Pieces
Production Hrs. Annual 7,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,008 10,745,600 kWh $0.06
Electricity Demand $171,939 20,228 kW-months/year $8.50
Electricity Fees $140,560 - $ -
TOTAL ENERGY COSTS $903,508
RECOMMENDED SAVINGS* $232,252 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $150,260
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$45,349
Cost:
$76,979
$35,956 653,737 $9,393 1,105 $35,956
653,737
kWh
$9,393
1,105
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$41,184
Cost:
$480
$32,752 595,496 $8,432 992 $32,752
595,496
kWh
$8,432
992
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,197
Cost:
$11,846
$24,805 451,000 $6,392 752 $24,805
451,000
kWh
$6,392
752
kW-months/year
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$26,104
Cost:
$3,000
$20,757 377,405 $5,347 629 $20,757
377,405
kWh
$5,347
629
kW-months/year
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$24,458
Cost:
$31,600
$20,182 366,939 $4,276 503 $20,182
366,939
kWh
$4,276
503
kW-months/year
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$21,780
Cost:
$78,320
$9,680 176,000 $12,100 1,424 $9,680
176,000
kWh
$12,100
1,424
kW-months/year
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,813
Cost:
$2,030
$13,042 237,121 $2,771 326 $13,042
237,121
kWh
$2,771
326
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,515
Cost:
$19,215
$11,540 209,813 $2,975 350 $11,540
209,813
kWh
$2,975
350
kW-months/year
09: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,557
Cost:
$2,528
$3,460 62,915 $1,097 129 $3,460
62,915
kWh
$1,097
129
kW-months/year
10: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,724
Cost:
$7,314
$3,069 55,808 $655 77 $3,069
55,808
kWh
$655
77
kW-months/year
11: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,571
Cost:
$6,578
$2,355 42,814 $1,216 143 $2,355
42,814
kWh
$1,216
143
kW-months/year
TOTAL RECOMMENDED Savings:
$232,252
Cost:
$239,890
$177,598 3,229,048 $54,654 6,430 $177,598
3,229,048
kWh
$54,654
6,430
kW-months/year
TOTAL IMPLEMENTED Savings:
$150,260
Cost:
$115,596
$119,471 2,172,194 $30,789 3,622 $119,471
2,172,194
kWh
$30,789
3,622
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand