IAC logo
IAC Assessment: MI0366
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0366
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Automotive Accessories
NAICS 334310 - Audio and Video Equipment Manufacturing
SIC 3651 - Household Audio And Video Equipment
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 180,600
Annual Production 6,000,000 Pieces
Production Hrs. Annual 2,601
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $240,815 4,770,409 kWh $0.05
Electricity Demand $141,323 12,914 kW-months/year $10.94
Electricity Fees $81,804 - $ -
TOTAL ENERGY COSTS $463,942
RECOMMENDED SAVINGS* $71,526 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50,590
Cost:
$93,076
$25,049 500,979 $25,541 2,334 $25,049
500,979
kWh
$25,541
2,334
kW-months/year
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,035
Cost:
$1,115
$4,035 80,693 - - $4,035
80,693
kWh
-
-
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,152
Cost:
$120
$3,368 67,363 $1,784 163 $3,368
67,363
kWh
$1,784
163
kW-months/year
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,435
Cost:
$4,831
$3,435 68,706 - - $3,435
68,706
kWh
-
-
kW-months/year
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$3,258
Cost:
$2,265
$3,499 69,971 $(-241) (-22) $3,499
69,971
kWh
$(-241)
(-22)
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,463
Cost:
$1,980
$959 19,188 $504 46 $959
19,188
kWh
$504
46
kW-months/year
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,903
Cost:
$4,341
$1,159 23,174 $744 68 $1,159
23,174
kWh
$744
68
kW-months/year
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,690
Cost:
$1,188
$1,690 33,804 - - $1,690
33,804
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$71,526
Cost:
$108,916
$43,194 863,878 $28,332 2,589 $43,194
863,878
kWh
$28,332
2,589
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand