Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2021 |
Principal Product | Aircraft Landing Gear |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 30,000 Pieces |
Production Hrs. Annual | 6,552 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $447,939 | 6,869,323 | kWh | $0.07 |
Electricity Demand | $183,414 | 15,687 | kW-months/year | $11.69 |
Electricity Fees | $176,961 | - | $ | - |
Natural Gas | $19,200 | 5,000 | MMBtu | $3.84 |
Fuel Oil #2 | $5,358 | 275 | MMBtu | $19.48 |
TOTAL ENERGY COSTS | $832,872 | |||
RECOMMENDED SAVINGS* | $182,991 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $108,618 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $48,176 Cost: $80 |
- | - | - | - | $48,176 | - | - | - |
- - kWh |
- - kW-months/year |
$48,176 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $43,876 Cost: $480 |
$35,107 | 540,115 | $8,769 | 750 | - | - | - | - |
$35,107 540,115 kWh |
$8,769 750 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $21,739 Cost: $33,655 |
$16,134 | 248,221 | $5,605 | 479 | - | - | - | - |
$16,134 248,221 kWh |
$5,605 479 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3312 INSTALL EFFICIENT RECTIFIERS |
Savings: $21,196 Cost: $55,920 |
$15,841 | 243,703 | $5,355 | 458 | - | - | - | - |
$15,841 243,703 kWh |
$5,355 458 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $19,025 Cost: $120 |
$15,237 | 234,411 | $3,788 | 324 | - | - | - | - |
$15,237 234,411 kWh |
$3,788 324 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $15,421 Cost: $6,812 |
$12,299 | 189,216 | $3,122 | 267 | - | - | - | - |
$12,299 189,216 kWh |
$3,122 267 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $10,000 Cost: $480 |
$6,761 | 104,011 | $3,239 | 277 | - | - | - | - |
$6,761 104,011 kWh |
$3,239 277 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4227 USE COMPRESSOR AIR FILTERS |
Savings: $1,420 Cost: $1,100 |
$1,420 | 21,847 | - | - | - | - | - | - |
$1,420 21,847 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $1,362 Cost: $616 |
$920 | 14,149 | $257 | 22 | - | - | $185 | 48 |
$920 14,149 kWh |
$257 22 kW-months/year |
- - $ |
$185 48 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8112 COMBINE UTILITY METERS |
Savings: $776 Cost: $240 |
- | - | - | - | $776 | - | - | - |
- - kWh |
- - kW-months/year |
$776 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $182,991 Cost: $99,503 |
$103,719 | 1,595,673 | $30,135 | 2,577 | $48,952 | - | $185 | 48 | $103,719 1,595,673 kWh |
$30,135 2,577 kW-months/year |
$48,952 - $ |
$185 48 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $108,618 Cost: $91,891 |
$84,659 | 1,302,446 | $23,774 | 2,033 | - | - | $185 | 48 | $84,659 1,302,446 kWh |
$23,774 2,033 kW-months/year |
- - $ |
$185 48 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |