IAC logo
IAC Assessment: MI0389
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0389
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2021
Principal Product Aircraft Landing Gear
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 200,000
Annual Production 30,000 Pieces
Production Hrs. Annual 6,552
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $447,939 6,869,323 kWh $0.07
Electricity Demand $183,414 15,687 kW-months/year $11.69
Electricity Fees $176,961 - $ -
Natural Gas $19,200 5,000 MMBtu $3.84
Fuel Oil #2 $5,358 275 MMBtu $19.48
TOTAL ENERGY COSTS $832,872
RECOMMENDED SAVINGS* $182,991 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $108,618
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$48,176
Cost:
$80
- - - - $48,176 - - - -
-
kWh
-
-
kW-months/year
$48,176
-
$
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$43,876
Cost:
$480
$35,107 540,115 $8,769 750 - - - - $35,107
540,115
kWh
$8,769
750
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,739
Cost:
$33,655
$16,134 248,221 $5,605 479 - - - - $16,134
248,221
kWh
$5,605
479
kW-months/year
-
-
$
-
-
MMBtu
04: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$21,196
Cost:
$55,920
$15,841 243,703 $5,355 458 - - - - $15,841
243,703
kWh
$5,355
458
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,025
Cost:
$120
$15,237 234,411 $3,788 324 - - - - $15,237
234,411
kWh
$3,788
324
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$15,421
Cost:
$6,812
$12,299 189,216 $3,122 267 - - - - $12,299
189,216
kWh
$3,122
267
kW-months/year
-
-
$
-
-
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,000
Cost:
$480
$6,761 104,011 $3,239 277 - - - - $6,761
104,011
kWh
$3,239
277
kW-months/year
-
-
$
-
-
MMBtu
08: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$1,420
Cost:
$1,100
$1,420 21,847 - - - - - - $1,420
21,847
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,362
Cost:
$616
$920 14,149 $257 22 - - $185 48 $920
14,149
kWh
$257
22
kW-months/year
-
-
$
$185
48
MMBtu
10: 2.8112 COMBINE UTILITY METERS Savings:
$776
Cost:
$240
- - - - $776 - - - -
-
kWh
-
-
kW-months/year
$776
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$182,991
Cost:
$99,503
$103,719 1,595,673 $30,135 2,577 $48,952 - $185 48 $103,719
1,595,673
kWh
$30,135
2,577
kW-months/year
$48,952
-
$
$185
48
MMBtu
TOTAL IMPLEMENTED Savings:
$108,618
Cost:
$91,891
$84,659 1,302,446 $23,774 2,033 - - $185 48 $84,659
1,302,446
kWh
$23,774
2,033
kW-months/year
-
-
$
$185
48
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas