IAC logo
IAC Assessment: MI0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2021
Principal Product Food Products
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 385,000
Annual Production 25,000,000 Pieces
Production Hrs. Annual 3,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $311,133 5,099,256 kWh $0.06
Electricity Demand $116,364 12,708 kW-months/year $9.16
Electricity Fees $35,282 - $ -
Natural Gas $32,103 8,116 MMBtu $3.96
TOTAL ENERGY COSTS $494,882
RECOMMENDED SAVINGS* $49,917 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,401
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$13,967
Cost:
$34,488
$6,696 109,770 $7,271 794 - - $6,696
109,770
kWh
$7,271
794
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,855
Cost:
$11,226
$6,518 106,853 $1,337 146 - - $6,518
106,853
kWh
$1,337
146
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,931
Cost:
$3,518
$5,931 97,229 - - - - $5,931
97,229
kWh
-
-
kW-months/year
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$5,597
Cost:
$320
$4,571 74,941 $1,026 112 - - $4,571
74,941
kWh
$1,026
112
kW-months/year
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,218
Cost:
$1,980
$1,976 32,398 $3,242 354 - - $1,976
32,398
kWh
$3,242
354
kW-months/year
-
-
$
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$4,615
Cost:
$1,827
- - $4,615 504 - - -
-
kWh
$4,615
504
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,897
Cost:
$1,980
$1,187 19,463 $2,710 296 - - $1,187
19,463
kWh
$2,710
296
kW-months/year
-
-
$
08: 2.8112 COMBINE UTILITY METERS Savings:
$2,837
Cost:
$100
- - - - $2,837 - -
-
kWh
-
-
kW-months/year
$2,837
-
$
TOTAL RECOMMENDED Savings:
$49,917
Cost:
$55,439
$26,879 440,654 $20,201 2,206 $2,837 - $26,879
440,654
kWh
$20,201
2,206
kW-months/year
$2,837
-
$
TOTAL IMPLEMENTED Savings:
$18,401
Cost:
$16,571
$12,449 204,082 $5,952 650 - - $12,449
204,082
kWh
$5,952
650
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees