IAC logo
IAC Assessment: MI0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2023
Principal Product Electronic Components
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 100,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 3,223
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $176,153 3,135,737 kWh $0.06
Electricity Demand $135,986 8,185 kW-months/year $16.61
Electricity Fees $9,209 - $ -
TOTAL ENERGY COSTS $332,896
RECOMMENDED SAVINGS* $77,054 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage
$ kWh $ kW-months/year $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$29,836
Cost:
$550
$18,190 324,813 $11,646 701 - - $18,190
324,813
kWh
$11,646
701
kW-months/year
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,559
Cost:
$12,210
$7,870 140,533 $8,689 523 - - $7,870
140,533
kWh
$8,689
523
kW-months/year
-
-
Tgal
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$14,048
Cost:
-
$14,048 250,859 - - - - $14,048
250,859
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,225
Cost:
$2,000
$4,015 71,694 $2,210 133 - - $4,015
71,694
kWh
$2,210
133
kW-months/year
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,323
Cost:
$7,394
$1,579 28,195 $1,744 105 - - $1,579
28,195
kWh
$1,744
105
kW-months/year
-
-
Tgal
06: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$3,200
Cost:
$3,460
- - - - $3,200 500 -
-
kWh
-
-
kW-months/year
$3,200
500
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,333
Cost:
$750
$2,333 41,668 - - - - $2,333
41,668
kWh
-
-
kW-months/year
-
-
Tgal
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,530
Cost:
$960
$986 17,604 $544 33 - - $986
17,604
kWh
$544
33
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$77,054
Cost:
$27,324
$49,021 875,366 $24,833 1,495 $3,200 500 $49,021
875,366
kWh
$24,833
1,495
kW-months/year
$3,200
500
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Usage Electricity Usage Electricity Demand Water Usage