Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2024 |
Principal Product | HVAC Equipment |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 210,000 |
Annual Production | 70,000 Units |
Production Hrs. Annual | 6,630 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $162,483 | 2,619,360 | kWh | $0.06 |
Electricity Demand | $97,768 | 6,500 | kW-months/year | $15.04 |
Electricity Fees | $56,246 | - | $ | - |
Fuel Oil #2 | $6,000 | 277 | MMBtu | $21.63 |
TOTAL ENERGY COSTS | $337,483 | |||
RECOMMENDED SAVINGS* | $62,133 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $16,134 Cost: $240 |
- | - | $16,134 | 1,073 | - | - | - | - | - | - |
- - kWh |
$16,134 1,073 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4155 METER WASTE WATER |
Savings: $13,483 Cost: $956 |
- | - | - | - | - | - | $13,483 | 2,251 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,483 2,251 Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,876 Cost: $16,028 |
$5,936 | 95,737 | $3,940 | 262 | - | - | - | - | - | - |
$5,936 95,737 kWh |
$3,940 262 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $9,720 Cost: $159,280 |
$4,464 | 72,000 | - | - | $5,256 | 243 | - | - | - | - |
$4,464 72,000 kWh |
- - kW-months/year |
$5,256 243 MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,918 Cost: $917 |
$5,557 | 89,627 | $2,361 | 157 | - | - | - | - | - | - |
$5,557 89,627 kWh |
$2,361 157 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $5,002 Cost: $70 |
$2,443 | 39,403 | $3,039 | 202 | - | - | - | - | $(-480) | - |
$2,443 39,403 kWh |
$3,039 202 kW-months/year |
- - MMBtu |
- - Tgal |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $62,133 Cost: $177,491 |
$18,400 | 296,767 | $25,474 | 1,694 | $5,256 | 243 | $13,483 | 2,251 | $(-480) | - | $18,400 296,767 kWh |
$25,474 1,694 kW-months/year |
$5,256 243 MMBtu |
$13,483 2,251 Tgal |
$(-480) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Personnel Changes | Electricity Usage | Electricity Demand | Fuel Oil #2 | Water Disposal | Personnel Changes |