IAC logo
IAC Assessment: MI0452
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0452
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product IAA Repair/Overhaul of Airplane Engines
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $10,000,000-$50,000,000
# of Employees 162
Plant Area (Sq.Ft.) 125,000
Annual Production 33,000 Pieces
Production Hrs. Annual 5,151
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $142,292 2,410,320 kWh $0.06
Electricity Demand $104,673 6,878 kW-months/year $15.22
Electricity Fees $63,921 - $ -
TOTAL ENERGY COSTS $310,886
RECOMMENDED SAVINGS* $108,095 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,470
Cost:
$860
$3,415 57,881 $2,055 135 $3,415
57,881
kWh
$2,055
135
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,989
Cost:
$960
$665 11,279 $1,324 87 $665
11,279
kWh
$1,324
87
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,550
Cost:
$1,660
$1,591 26,962 $959 63 $1,591
26,962
kWh
$959
63
kW-months/year
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,049
Cost:
$4,092
$3,781 64,085 $2,268 149 $3,781
64,085
kWh
$2,268
149
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,650
Cost:
$23,081
$10,400 176,267 $6,250 411 $10,400
176,267
kWh
$6,250
411
kW-months/year
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$14,517
Cost:
$21,120
$9,069 153,704 $5,448 358 $9,069
153,704
kWh
$5,448
358
kW-months/year
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,069
Cost:
$3,165
$1,293 21,909 $776 51 $1,293
21,909
kWh
$776
51
kW-months/year
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,068
Cost:
$14,019
$3,647 61,817 $1,421 93 $3,647
61,817
kWh
$1,421
93
kW-months/year
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$204
Cost:
$590
$128 2,168 $76 5 $128
2,168
kWh
$76
5
kW-months/year
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$53,529
Cost:
$245,201
$17,606 298,413 $35,923 2,360 $17,606
298,413
kWh
$35,923
2,360
kW-months/year
TOTAL RECOMMENDED Savings:
$108,095
Cost:
$314,748
$51,595 874,485 $56,500 3,712 $51,595
874,485
kWh
$56,500
3,712
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand