Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2024 |
Principal Product | IAA Repair/Overhaul of Airplane Engines |
NAICS | 336411 - Aircraft Manufacturing |
SIC | 3721 - Aircraft |
Sales | $10,000,000-$50,000,000 |
# of Employees | 162 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 33,000 Pieces |
Production Hrs. Annual | 5,151 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $142,292 | 2,410,320 | kWh | $0.06 |
Electricity Demand | $104,673 | 6,878 | kW-months/year | $15.22 |
Electricity Fees | $63,921 | - | $ | - |
TOTAL ENERGY COSTS | $310,886 | |||
RECOMMENDED SAVINGS* | $108,095 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,470 Cost: $860 |
$3,415 | 57,881 | $2,055 | 135 |
$3,415 57,881 kWh |
$2,055 135 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,989 Cost: $960 |
$665 | 11,279 | $1,324 | 87 |
$665 11,279 kWh |
$1,324 87 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,550 Cost: $1,660 |
$1,591 | 26,962 | $959 | 63 |
$1,591 26,962 kWh |
$959 63 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $6,049 Cost: $4,092 |
$3,781 | 64,085 | $2,268 | 149 |
$3,781 64,085 kWh |
$2,268 149 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $16,650 Cost: $23,081 |
$10,400 | 176,267 | $6,250 | 411 |
$10,400 176,267 kWh |
$6,250 411 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $14,517 Cost: $21,120 |
$9,069 | 153,704 | $5,448 | 358 |
$9,069 153,704 kWh |
$5,448 358 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,069 Cost: $3,165 |
$1,293 | 21,909 | $776 | 51 |
$1,293 21,909 kWh |
$776 51 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL |
Savings: $5,068 Cost: $14,019 |
$3,647 | 61,817 | $1,421 | 93 |
$3,647 61,817 kWh |
$1,421 93 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $204 Cost: $590 |
$128 | 2,168 | $76 | 5 |
$128 2,168 kWh |
$76 5 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $53,529 Cost: $245,201 |
$17,606 | 298,413 | $35,923 | 2,360 |
$17,606 298,413 kWh |
$35,923 2,360 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $108,095 Cost: $314,748 |
$51,595 | 874,485 | $56,500 | 3,712 | $51,595 874,485 kWh |
$56,500 3,712 kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - - kWh |
- - kW-months/year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Usage | Electricity Demand |